The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Establish area for drainage works
|
|
Tools and safety equipment requirements are identified and obtained, and lines and levels are set up according to plan. Completed |
Evidence:
|
Lines and levels are set up according to plan. Completed |
Evidence:
|
Excavation is undertaken according to plan. Completed |
Evidence:
|
Excavation is secured to prevent injury to the public and workers. Completed |
Evidence:
|
Appropriate drainage is provided to allow for the diversion of uncontaminated stormwater from the work site and to prevent environmental damage. Completed |
Evidence:
|
Environmental protection devices are installed as required to meet requirements. Completed |
Evidence:
|
Formwork or shoring is provided where required. Completed |
Evidence:
|
Work is planned and undertaken in accordance with occupational health and safety (OHS) and traffic control requirements. Completed |
Evidence:
|
Construct or restore ground drainage
|
|
Pre-bedding is laid to specifications. Completed |
Evidence:
|
Pre-cast or moulded structures are placed to specifications. Completed |
Evidence:
|
Construct or restore surface drains
|
|
Surface drains are prepared and levelled according to plan. Completed |
Evidence:
|
Earth and rubble drains are constructed to plan. Completed |
Evidence:
|
Maintain drainage systems
|
|
Surface drains are inspected and cleared of weeds and debris. Completed |
Evidence:
|
Subsoil drainage systems are flushed and cleaned. Completed |
Evidence:
|
Culverts are cleared of debris, cleaned and if necessary reinstated. Completed |
Evidence:
|
Drains, access holes, pits and traps are cleaned and repaired and if necessary reinstated. Completed |
Evidence:
|
Pipes are rehabilitated using proprietary rehabilitation systems. Completed |
Evidence:
|
Rehabilitate works area
|
|
Verges and medians are surfaced and planted or turfed according to specifications. Completed |
Evidence:
|
Site is restored to required condition. Completed |
Evidence:
|
Private and public property structures are reinstated. Completed |
Evidence:
|
Complete necessary documentation
|
|
Construction and maintenance reports are completed and filed to meet council's requirements. Completed |
Evidence:
|
The as constructed plans and drawings are completed in accordance with completed works. Completed |
Evidence:
|