The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for software installation
|
|
Program format and operational intent is accurately determined and required applications identified Completed |
Evidence:
|
Specifications are checked for required operating conditions Completed |
Evidence:
|
Program instructions are checked for compliance with specifications Completed |
Evidence:
|
Software timers are set to specification where required Completed |
Evidence:
|
Install automatic process machine control program
|
|
Appropriate program loading technique is selected Completed |
Evidence:
|
External loading devices are correctly connected to automatic process machine control systems Completed |
Evidence:
|
Machine control system is placed in correct operational mode to accept program loading Completed |
Evidence:
|
Program is downloaded in accordance with manufacturer recommended procedure and enterprise requirements Completed |
Evidence:
|
Checks are made during and after downloading to ensure accurate and complete data transfer Completed |
Evidence:
|
External program loading devices and connections are disconnected from process and machine control system Completed |
Evidence:
|
Commission automatic process and machine control program
|
|
Operation of the equipment using the program is observed Completed |
Evidence:
|
Outputs are checked and measured for compliance with specifications Completed |
Evidence:
|
External inputs are checked for compliance with specifications, according to specified procedures Completed |
Evidence:
|
Total operation is checked for compliance with specifications where applicable Completed |
Evidence:
|
Location of program master copy storage is confirmed Completed |
Evidence:
|