The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Verify the defect
|
|
Available information from flight crew, such as flight phase, aircraft configuration, and so on, maintenance documentation both current and previous history, is used as necessary, to assist in fault determination Completed |
Evidence:
|
Inspection of the affected system is carried out to check both physical integrity and correct operation |
|
Completed |
Evidence:
|
Information gained from Central Maintenance Systems is verified against physical integrity and correct operation, where applicable
|
|
. The effects on a system from interfaces/integration with other systems are taken into account Completed |
Evidence:
|
Isolate the defect
|
|
Logical processes including the application of basic principles and system knowledge and known facts are used to augment maintenance manual fault diagnosis guides to ensure efficient and accurate troubleshooting Completed |
Evidence:
|
Specialist advice is obtained, where required and/or available, to assist with the troubleshooting process Completed |
Evidence:
|
Faults are located and the causes of the defects are clearly identified and correctly recorded in maintenance documentation including any other systems disturbed, where required Completed |
Evidence:
|
Determine defect rectification requirements
|
|
Defect rectification requirements are determined and the necessary repair action initiated once verification and isolation of the defect are confirmed Completed |
Evidence:
|
Verify defect rectification
|
|
Defect is rectified in accordance with approved maintenance data Completed |
Evidence:
|
All systems disturbed or accessed during troubleshooting are restored as applicable using maintenance manuals, repair schemes or approved maintenance data Completed |
Evidence:
|
All check(s) required by approved maintenance data to ensure correct operation of all disturbed systems are performed Completed |
Evidence:
|