The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan repair or modification
|
|
Assess the extent of damage, including using visual and tap test methods, to assist in determining modification or repair procedure Completed |
Evidence:
|
Support and prepare structure in accordance with the applicable maintenance manual to ensure personnel safety and freedom from damage, while observing all relevant work health and safety (WHS) requirements, including the use of material safety data sheets (MSDSs) and items of personal protective equipment (PPE) Completed |
Evidence:
|
Identify appropriate modification or repair scheme in accordance with structural repair manual or approved data Completed |
Evidence:
|
Obtain specialist advice in establishing an approved modification or repair scheme where a standard modification or repair scheme cannot be identified, or damage criteria are out of limits Completed |
Evidence:
|
Organise required materials and equipment in accordance with maintenance manual Completed |
Evidence:
|
Repair or modify components using cold cure
|
|
Check lay-up of materials to confirm that components meet required specifications and bagging equipment is correctly installed and operated Completed |
Evidence:
|
Regularly monitor curing cycle to ensure required specifications are met Completed |
Evidence:
|
Check components for blemishes or delamination in accordance with quality procedures Completed |
Evidence:
|
Make ready component assemblies requiring further or special treatment for the appropriate processes Completed |
Evidence:
|
Complete required maintenance documentation and process in accordance with standard enterprise procedures Completed |
Evidence:
|
Tag, seal and pack completed assemblies as required Completed |
Evidence:
|