The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Select and use personnel protective equipment
|
|
Personal protective clothing and equipment is selected and used correctly and in accordance with standard workplace procedures. Completed |
Evidence:
|
Carry out pre-operational checks
|
|
Pre-operational checks of boiler are undertaken correctly to plant operating procedures. Completed |
Evidence:
|
Maintenance requirements and visual faults are reported according to standard workplace procedures. Completed |
Evidence:
|
Maintain health and safety standards in work area
|
|
Hazards and potential hazards are identified and reported according to standard workplace procedures. Completed |
Evidence:
|
Hazard prevention/control measures are selected and used as required. Completed |
Evidence:
|
Start boiler
|
|
Boiler is started and brought on line safely, consistent with workplace procedures and production requirements. Completed |
Evidence:
|
Conduct hand-over/take-over procedures
|
|
Operating status of boiler is confirmed. Completed |
Evidence:
|
Operating log is maintained and boiler status/operation is communicated according to workplace procedures. Completed |
Evidence:
|
Operate and monitor boiler
|
|
Boiler is operated and monitored consistent with production and safety requirements. Completed |
Evidence:
|
Boiler water quality tests are conducted to manufacturer's recommendations and workplace procedures. Completed |
Evidence:
|
Boiler water quality is adjusted as required to manufacturer's recommendations and workplace procedures. Completed |
Evidence:
|
Boiler failures/emergencies are acted on according to workplace procedures and downstream users are notified, if necessary. Completed |
Evidence:
|
Carry out boiler operational shut-down
|
|
Boiler is shut down consistent with workplace procedures, production and safety requirements. Completed |
Evidence:
|
Carry out boiler shut-down for an internal inspection
|
|
Boiler is shut down for internal inspection according to manufacturer's recommendations and workplace procedures. Completed |
Evidence:
|
Boiler is cleaned internally and externally to manufacturer's recommendations and workplace procedures. Completed |
Evidence:
|
Store boiler in shut-down mode
|
|
Required storage mode is identified. Completed |
Evidence:
|
Boiler is stored to manufacturer's recommendations and workplace procedures. Completed |
Evidence:
|