The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine work requirements
|
|
Follow standard operating procedures (SOPs) and comply with work health and safety (WHS) requirements at all times Completed |
Evidence:
|
Determine purpose, scope and information requirements for drawing or model Completed |
Evidence:
|
Interpret available information relevant to work requirements, and identify and address further information needs Completed |
Evidence:
|
Identify and prepare equipment required to complete work Completed |
Evidence:
|
Apply relevant codes, standards and symbols used for pipe installation drawings or models Completed |
Evidence:
|
Identify and access organisational files, templates and symbols required for work Completed |
Evidence:
|
Identify environmental implications of inefficient systems and strategies for minimising impact Completed |
Evidence:
|
Analyse piping system components
|
|
Interpret piping and instrumentation diagrams and specifications Completed |
Evidence:
|
Identify required pipe fittings and flanges and their application Completed |
Evidence:
|
Identify required function and application of valves and auxiliary equipment Completed |
Evidence:
|
Identify required components for piping systems Completed |
Evidence:
|
Produce drawings or models for installation of industrial piping systems
|
|
Apply operating principles and specifications of piping systems and equipment to drawing or model Completed |
Evidence:
|
Detail pipes, valves and auxiliary equipment Completed |
Evidence:
|
Indicate vertical and horizontal offsets and hand wheel orientation Completed |
Evidence:
|
Apply WHS and environmental factors to drawing detail Completed |
Evidence:
|
Present drawing or model according to organisational requirements Completed |
Evidence:
|
Produce process flow, piping and instrumentation diagrams (P&ID) and isometric and spool drawings Completed |
Evidence:
|
Produce orthogonal single and double-line arrangement drawings of pipe installation systems in accordance with engineer’s sketches Completed |
Evidence:
|
Prepare cutting lists from the arrangement and detail drawings Completed |
Evidence:
|
Complete drawing or model task
|
|
Confirm drawing or model accuracy and compliance with industry standard Completed |
Evidence:
|
File drawing in accordance with SOPs Completed |
Evidence:
|