The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine job requirements
|
|
Follow standard operating procedures (SOPs) Completed |
Evidence:
|
Comply with work health and safety (WHS) requirements at all times |
|
Completed |
Evidence:
|
Use appropriate personal protective equipment (PPE) in accordance with SOPs |
|
Completed |
Evidence:
|
Identify job requirements from specifications, drawings, job sheets or work instructions |
|
Completed |
Evidence:
|
Inspect and prepare installation site
|
|
Check site for correct location, dimension and levels using appropriate measuring equipment and standard refrigeration/air conditioning practices Completed |
Evidence:
|
Report non-compliance with specification to appropriate authority |
|
Completed |
Evidence:
|
Undertake alteration/correction with approval of appropriate authority |
|
Completed |
Evidence:
|
Prepare all surfaces, materials and components for use |
|
Completed |
Evidence:
|
Install refrigeration/air conditioning plant and equipment
|
|
Carry out all work safely and in accordance with site procedures and to relevant standards Completed |
Evidence:
|
Organise refrigeration/air conditioning plant and equipment/components for correct sequential installation |
|
Completed |
Evidence:
|
Install refrigeration/air conditioning plant and equipment/components in conformance with manufacturers' and site specifications |
|
Completed |
Evidence:
|
Undertake routine modifications/alterations of the refrigeration/air conditioning plant and equipment according to procedures, as required |
|
Completed |
Evidence:
|
Ensure refrigeration/air conditioning plant and equipment are levelled, aligned, coupled and connected in accordance with specifications |
|
Completed |
Evidence:
|
Ensure the refrigeration system is charged with refrigerant and lubricant in accordance with procedures |
|
Completed |
Evidence:
|
Clean the site and clear all debris and leave in a safe state |
|
Completed |
Evidence:
|
Start up refrigeration/ air conditioning plant and equipment and check operation
|
|
Develop start-up procedure for the refrigeration/air conditioning plant and equipment Completed |
Evidence:
|
Ensure the refrigeration/air conditioning plant and equipment are operated and assessed for conformance to specification |
|
Completed |
Evidence:
|
Identify non-conformances and system faults and take appropriate action/adjustments to specification |
|
Completed |
Evidence:
|
Complete all reports and documentation to required specifications |
|
Completed |
Evidence:
|