The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Inspect and prepare installation site
|
|
Site is checked for correct location, dimension and levels, etc. using appropriate measuring equipment and standard refrigeration/air conditioning practices. Completed |
Evidence:
|
Non-compliance with specification is reported to appropriate authority. Completed |
Evidence:
|
Alteration/correction is undertaken with approval of appropriate authority. Completed |
Evidence:
|
All surfaces, materials and components are prepared for use. Completed |
Evidence:
|
Install refrigeration/air conditioning plant and equipment
|
|
All work is carried out safely and in accordance with site procedures and to relevant standards. Completed |
Evidence:
|
Refrigeration/air conditioning plant and equipment/components are organised for correct sequential installation. Completed |
Evidence:
|
Refrigeration/air conditioning plant and equipment/components are installed in conformance with manufacturers' and site specifications. Completed |
Evidence:
|
Routine modifications/alterations of the refrigeration/air conditioning plant and equipment are undertaken to standard operating procedures where required. Completed |
Evidence:
|
Refrigeration/air conditioning plant and equipment are levelled, aligned, coupled and connected in accordance with specifications. Completed |
Evidence:
|
The refrigeration system is charged with refrigerant and lubricant in accordance with standard operating procedures. Completed |
Evidence:
|
The site is cleaned and cleared of all debris and left in a safe state. Completed |
Evidence:
|
Start up refrigeration/air conditioning plant and equipment and check operation
|
|
Start-up procedure is developed for the refrigeration/air conditioning plant and equipment. Completed |
Evidence:
|
The refrigeration/air conditioning plant and equipment is operated and assessed for conformance to specification. Completed |
Evidence:
|
Non-conformances and system faults are identified, and appropriate action/adjustments are taken to specification. Completed |
Evidence:
|
All reports and documentation are completed correctly to required specifications. Completed |
Evidence:
|