The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine job requirements
|
|
Follow standard operating procedures (SOPs) Completed |
Evidence:
|
Comply with work health and safety (WHS) requirements at all times, including appropriate risk control measures Completed |
Evidence:
|
Use appropriate personal protective equipment (PPE) in accordance with SOPs Completed |
Evidence:
|
Consult and obtain approval from authorised personnel the need to commission or decommission electrical equipment or installation Completed |
Evidence:
|
Analyse and confirm commissioning, switching and work schedules, including drawings, plans and regulatory requirements Completed |
Evidence:
|
Prepare to commission or decommission electrical equipment or installation
|
|
Inspect or confirm suitability and safety of electrical equipment or installation site for required commissioning or decommissioning Completed |
Evidence:
|
Identify and obtain WHS policies and procedures related to the requirements for commissioning or decommissioning electrical equipment or installation Completed |
Evidence:
|
Obtain necessary tools, equipment and testing devices needed for commission or decommission electrical equipment or installation Completed |
Evidence:
|
Brief others participating in or affected by the work on commissioning or decommissioning of electrical equipment or installation Completed |
Evidence:
|
Prepare the site according to the work schedule to minimise risk, disruption and damage to property, operations and individuals Completed |
Evidence:
|
Commission or decommission electrical equipment or installation
|
|
Commission electrical equipment or installation using a systems approach, including the use of appropriate test equipment, in accordance with the approved commissioning schedule Completed |
Evidence:
|
Verify that the performance of the installed equipment/installation through a series of tests is consistent with the customer requirements/specified design intent Completed |
Evidence:
|
Capture and record performance data of the whole installation as the baseline for future operation and maintenance Completed |
Evidence:
|
Decommission electrical equipment or installation using an approved decommissioning schedule, including the use of appropriate test equipment, according to requirements and established procedures Completed |
Evidence:
|
Shut down and isolate electrical equipment or installation sequentially in preparation for repair or maintenance work using safe working practices Completed |
Evidence:
|
Deal safely with unexpected situations during the isolation process, including, where required, the approval of an authorised person Completed |
Evidence:
|
Complete commission or decommission electrical equipment or installation
|
|
Check work undertaken against work schedules for conformance with requirements and report anomalies in accordance with established procedures Completed |
Evidence:
|
Document completion of commissioning or decommissioning of electrical equipment or installation in accordance with established procedures Completed |
Evidence:
|