The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Assess rigging site
|
|
Rigging to be undertaken is identified and assessed from supervisor’s instructions, drawings and other appropriate sources Completed |
Evidence:
|
Equipment and processes in close proximity to rigging site are identified and need for protection, shielding or closure during rigging identified with appropriate personnel Completed |
Evidence:
|
Other potential workplace hazards and appropriate hazard control measures are identified Completed |
Evidence:
|
Site information is obtained Completed |
Evidence:
|
Rigging equipment and associated equipment, including safety equipment available on site, is identified Completed |
Evidence:
|
Plan rigging work
|
|
All forces and loads associated with erecting and dismantling structures and associated equipment are considered in consultation with appropriate personnel Completed |
Evidence:
|
Required safety equipment for rigging task is identified Completed |
Evidence:
|
Procedures for minimising disruption to other site processes are considered Completed |
Evidence:
|
Appropriate communication methods are identified with appropriate personnel Completed |
Evidence:
|
Select and inspect equipment
|
|
Rigging equipment and associated equipment is selected and inspected according to procedures and the appropriate standard Completed |
Evidence:
|
Required safety equipment is selected and inspected according to procedures Completed |
Evidence:
|
All defective rigging equipment, associated equipment and safety equipment is isolated, reported and recorded according to procedures Completed |
Evidence:
|
Where applicable, communication equipment is selected and inspected for serviceability Completed |
Evidence:
|
Set up rigging task
|
|
Appropriate hazard prevention or control measures are applied to the work area according to procedures Completed |
Evidence:
|
Ground suitability is inspected and checked where appropriate Completed |
Evidence:
|
Site information is reviewed and interpreted with appropriate personnel Completed |
Evidence:
|
All forces and loads associated with erecting and dismantling structures and associated plant are determined and compared with planned forces and loads in consultation with appropriate personnel Completed |
Evidence:
|
Required adjustments for actual forces and loads are made to rigging plan, rigging equipment, associated equipment and safety equipment Completed |
Evidence:
|
Personal safety equipment is fitted and worn correctly Completed |
Evidence:
|
Rigging equipment and associated plant are positioned for work application and stability according to procedures Completed |
Evidence:
|
Methods of applying temporary connections using fibre rope are applied according to procedures and the appropriate standard Completed |
Evidence:
|
Erect, move or dismantle structures, plant or equipment
|
|
Structures, plant or equipment are erected, moved or dismantled according to procedures and site information Completed |
Evidence:
|
Stability of structures, plant or equipment is maintained during erection, movement or dismantling Completed |
Evidence:
|
Where height work is required, safety procedures are followed, including safe and effective use of safety equipment Completed |
Evidence:
|
Appropriate communication methods and communication equipment are used to coordinate the rigging tasks Completed |
Evidence:
|
Associated plant and equipment are used according to procedures and the appropriate standard Completed |
Evidence:
|
Temporary guys, ties, propping and shoring, including flexible steel wire rope and tubing, are connected where required Completed |
Evidence:
|
Procedures are followed to minimise disruption to other site operations Completed |
Evidence:
|
The completed task is inspected according to the appropriate standard Completed |
Evidence:
|
Finalise rigging task
|
|
Approval for completion of rigging task is obtained according to site or enterprise procedures Completed |
Evidence:
|
Excess materials are removed from the work area, where applicable Completed |
Evidence:
|
Rigging equipment, associated equipment, safety equipment and associated plant used during rigging task are inspected for damage and defects Completed |
Evidence:
|
All defective rigging equipment, associated equipment, associated plant and safety equipment are isolated reported and recorded according to procedures Completed |
Evidence:
|
Rigging equipment and associated equipment are stored according to procedures and the appropriate standard Completed |
Evidence:
|
Hazard prevention/control measures are removed, where appropriate Completed |
Evidence:
|