The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare design specifications
|
|
Obtain and implement work health and safety (WHS) and environmental requirements for the work area Completed |
Evidence:
|
Consult appropriate personnel to ensure that work is coordinated effectively with others Completed |
Evidence:
|
Obtain equipment and resources needed for the task in accordance with organisational procedures and check for correct operation and safety Completed |
Evidence:
|
Select a heating system design to meet the client requirements Completed |
Evidence:
|
Plan design development work to meet scheduled timelines Completed |
Evidence:
|
Check system design draft for compliance with the design brief, regulatory requirements and environmental standards Completed |
Evidence:
|
Calculate heating loads and matching heating capacity Completed |
Evidence:
|
Select appropriate heating equipment to satisfy design specifications Completed |
Evidence:
|
Provide solutions to unplanned situations consistent with organisational procedures Completed |
Evidence:
|
Document method of capacity rating and sizing for each discrete component in the system to industry standards using organisational procedures Completed |
Evidence:
|
Analyse system and adjust system performance
|
|
Evaluate system performance under variable conditions Completed |
Evidence:
|
Determine fulfilment of required heating capacity under full and partial load conditions Completed |
Evidence:
|
Verify final design using organisational procedures for compliance and regulatory requirements Completed |
Evidence:
|
Document final system design for client approval according to industry standards and organisational procedures Completed |
Evidence:
|