The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine job requirements
|
|
Follow standard operating procedures (SOPs) Completed |
Evidence:
|
Comply with work health and safety (WHS) requirements at all times |
|
Completed |
Evidence:
|
Use appropriate personal protective equipment (PPE) in accordance with SOPs |
|
Completed |
Evidence:
|
Identify job requirements from specifications, job sheets or work instructions |
|
Completed |
Evidence:
|
Select auxiliary system
|
|
Identify installation and compatibility of surface and fitting materials Completed |
Evidence:
|
Identify installation site of system |
|
Completed |
Evidence:
|
Select auxiliary system in accordance with job requirements |
|
Completed |
Evidence:
|
Identify material structure and installation procedures |
|
Completed |
Evidence:
|
Identify and verify associated installation/assembly plans/instruction |
|
Completed |
Evidence:
|
Install auxiliary system
|
|
Select appropriate tools for specified installation Completed |
Evidence:
|
Cut structural area to suit installation requirements, where applicable |
|
Completed |
Evidence:
|
Fit structural reinforcement to suit job requirement, where applicable |
|
Completed |
Evidence:
|
Prepare structural area for surface preparation |
|
Completed |
Evidence:
|
Apply coating sealants and/or isolation materials to suit job requirements |
|
Completed |
Evidence:
|
Apply fastening methods |
|
Completed |
Evidence:
|
Apply installation procedures in accordance with job specification |
|
Completed |
Evidence:
|
Apply clean work practices |
|
Completed |
Evidence:
|
Test operation of auxiliary system
|
|
Apply pre-test checks and verify before standard testing procedures are actioned Completed |
Evidence:
|
Identify and verify test operation procedures |
|
Completed |
Evidence:
|
Set up and use test equipment in accordance with testing practice |
|
Completed |
Evidence:
|
Test system in accordance with specified operational procedures |
|
Completed |
Evidence:
|
Record/report faults to appropriate authorities |
|
Completed |
Evidence:
|
Rectify faults and re-test for correct operation |
|
Completed |
Evidence:
|
Record and document final test operation according to SOPs |
|
Completed |
Evidence:
|