NTISthis.com

Evidence Guide: MEM27018 - Test, diagnose and rectify mobile and stationary plant external monitoring and control systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MEM27018 - Test, diagnose and rectify mobile and stationary plant external monitoring and control systems

What evidence can you provide to prove your understanding of each of the following citeria?

Determine job requirements

  1. Follow standard operating procedures (SOPs)
Follow standard operating procedures (SOPs)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Comply with work health and safety (WHS) requirements at all times

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use appropriate personal protective equipment (PPE) in accordance with SOPs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify job requirements from specifications, drawings, job sheets or work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate and identify features and purpose of external communication systems

  1. Determine on-board methods of communication and data exchange with external source
Determine on-board methods of communication and data exchange with external source

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate on-board electronic control module (ECMs) associated with external monitoring and control systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify other external monitoring and control system hardware and components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test external monitoring and control system

  1. Ensure equipment is parked with engine off or in specified safe mode for testing
Ensure equipment is parked with engine off or in specified safe mode for testing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check for damage to externally located antennae, sensors and other system components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review previous records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify location of service ports and other test locations and connect laptop or test equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Run specified test procedure or program to access data on system and plant performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify faults and determine if related to on-board component or ECM fault

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse information from tests and test equipment and identify faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trace on-board faults to root cause

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report off-board faults in system according to SOP’s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify on-board faults

  1. Repair or rectify faulty system components
Repair or rectify faulty system components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust program settings to workplace and manufacturer specifications for program related faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report continued program faults according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust, recalibrate or replace faulty sensors, aerials and antennae

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Re-test system and document work

  1. Re-test equipment external monitoring and control system to ensure compliance with specifications and workplace needs
Re-test equipment external monitoring and control system to ensure compliance with specifications and workplace needs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake any required final adjustments

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document work undertaken in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

The systems and equipment covered by this unit are found in stationary and mobile plant used in one or more of the following:

mining

agriculture

forestry

construction

transport industries

External monitoring and control systems include one (1) or more of the following:

integrated original equipment manufacturer (OEM) management and monitoring systems

bolt on systems

remote control and guidance systems, including on and off site remote control systems

single equipment system telemetry and monitoring systems

multi-mode systems allowing choice of operator control, semi-autonomous and fully autonomous control

load and yield management and monitoring

equipment condition monitoring and reporting systems

safety related systems, including proximity awareness and collision avoidance systems

Communication and data exchange method includes one or more of the following:

satellite

Wi-Fi

cellular

radio

global positioning system (GPS)

laser

Hardware and components include one (1) or more of the following

on-board electronic control modules (ECMs)

connectors

memory and communication interfaces

ethernet connectors

broadband transmitter/receiver (could be built into other hardware e.g. a PC)

radio frequency (RF) transmitter/receiver

laser transmitter/receiver

GPS receiver

satellite dish/aerial

displays, buzzers and signal lamps

operator switches and controls

antennae

fieldbus cables and connectors to other on-board systems and ECMs

sensors

radar

cameras

service ports

power input

service ports to allow for laptops and other test instrumentation to be connected (e.g. USB, serial and connecting cables)

External communication systems can be related to single equipment system which include one (1) or more of the following:

engine

tyres

load monitoring and reporting