The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine job requirements
|
|
Follow standard operating procedures (SOPs) Completed |
Evidence:
|
Comply with work health and safety (WHS) requirements at all times |
|
Completed |
Evidence:
|
Use appropriate personal protective equipment (PPE) in accordance with SOPs |
|
Completed |
Evidence:
|
Identify job requirements from specifications, drawings, job sheets or work instructions |
|
Completed |
Evidence:
|
Plan job to conform to Australian Refrigeration Council (ARC) code of practice requirements |
|
Completed |
Evidence:
|
Install air conditioning system in new mobile plant
|
|
Check that mobile plant is parked and engine/power source are safe for air conditioning system access and work Completed |
Evidence:
|
Check cabin installation site against drawings or specifications for access, dimension and levels |
|
Completed |
Evidence:
|
Check supplied air conditioning system matches specification and is complete |
|
Completed |
Evidence:
|
Identify locations for structural support brackets and other support and holding components |
|
Completed |
Evidence:
|
Identify air conditioning connection location and requirements for power, control modules, fieldbus wiring and sensors |
|
Completed |
Evidence:
|
Prepare all surfaces, materials and components for use |
|
Completed |
Evidence:
|
Install air conditioning system and connections in conformance with manufacturer and customer specifications |
|
Completed |
Evidence:
|
Check air conditioning system is levelled, aligned, coupled and connected in accordance with specifications |
|
Completed |
Evidence:
|
Charge system with specified refrigerant according to manufacturer specifications and regulatory requirements |
|
Completed |
Evidence:
|
Modify or retrofit mobile plant air conditioning system
|
|
Determine modification requirements from customer specifications, job instructions and drawings, and equipment manuals Completed |
Evidence:
|
Check that mobile plant is isolated/made safe according to SOPs |
|
Completed |
Evidence:
|
De-gas system using approved recovery unit and appropriate refrigerant recovery cylinder for the refrigerant type |
|
Completed |
Evidence:
|
Recover oil and evacuate system |
|
Completed |
Evidence:
|
Remove air conditioning system or components requiring modification according to SOPs |
|
Completed |
Evidence:
|
Retrofit or modify air conditioning system according to manufacturer specifications and customer requirements |
|
Completed |
Evidence:
|
Pressure test system and identify leaks and non-conformances to specifications |
|
Completed |
Evidence:
|
Re-charge system with specified refrigerant according to manufacturer specifications and regulatory requirements |
|
Completed |
Evidence:
|
Test and complete installation of new /retrofitted or modified mobile plant air conditioning system
|
|
Test air conditioning system for correct operation against specifications Completed |
Evidence:
|
Trace non-conformances to specifications to root cause and rectify |
|
Completed |
Evidence:
|
Document installation or modification actions according to workplace procedures |
|
Completed |
Evidence:
|