The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Identify the control and networking requirements for the PLC application
|
|
Identify the control system specifications and PLC application requirements from documentation, work request or discussion with relevant personnel Completed |
Evidence:
|
Analyse PLC application requirements and identify the relationship to the broader Industry 4.0 systems and environment in the enterprise Completed |
Evidence:
|
Analyse PLC application requirements for workplace health and safety (WHS) and risk control implications Completed |
Evidence:
|
Analyse control system specifications and PLC application requirements and determine the extent of local and cloud-based processing and programming required Completed |
Evidence:
|
Identify and select resources and equipment requiring local installation that are consistent with PLC application requirements and manufacturer’s specifications Completed |
Evidence:
|
Set up a PLC-based industrial control system
|
|
Apply WHS procedures and risk control measures associated with PLC application Completed |
Evidence:
|
Consult with appropriate personnel to ensure planned work is coordinated effectively with others and downtime is minimised Completed |
Evidence:
|
Check tools and equipment for serviceability and rectify or report any faults prior to commencement Completed |
Evidence:
|
Install required PLC modules, connectors, and other equipment according to manufacturer’s specifications and PLC application requirements Completed |
Evidence:
|
Program PLC locally or via cloud according to manufacturer’s specifications and PLC application requirements Completed |
Evidence:
|
Test and verify PLC program
|
|
Check equipment and machinery is isolated according to safety requirements before commencing PLC testing process Completed |
Evidence:
|
Test the function and operations of the PLC program Completed |
Evidence:
|
Resolve faults and other non-conformances including seeking expert assistance when needed Completed |
Evidence:
|
Verify test results and other diagnostic findings Completed |
Evidence:
|
Complete work and document PLC program
|
|
Advise appropriate personnel when PLC based industrial control system is completed and equipment and machinery can be released from isolation Completed |
Evidence:
|
Document PLC program and function test according to workplace procedures Completed |
Evidence:
|
Complete workplace documentation according to established procedures Completed |
Evidence:
|