The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Identify drawing requirements
|
|
Follow standard operating procedures (SOPs) and comply with work health and safety (WHS) requirements at all times Completed |
Evidence:
|
Identify information requirements for work and obtain all relevant job requirements and design specifications Completed |
Evidence:
|
Identify, interpret and analyse drawing requirements from specifications Completed |
Evidence:
|
Interpret and apply industry terminology for drawing work Completed |
Evidence:
|
Confirm communication practices required during drawing work Completed |
Evidence:
|
Establish time requirements for completing work Completed |
Evidence:
|
Select drawing features
|
|
Set up drawing list or register based on drawing requirements Completed |
Evidence:
|
Determine level of detail and numbers of drawings required for work Completed |
Evidence:
|
Plan presentation and layout, and determine drawing sheets and appropriate scales and text style and size Completed |
Evidence:
|
Identify features and applications of line types and thicknesses and select for drawing work Completed |
Evidence:
|
Establish datums and dimensions Completed |
Evidence:
|
Prepare and detail drawings
|
|
Prepare drawings in plane orthogonal, isometric projection or equivalent Completed |
Evidence:
|
Detail drawings in third angle projection, including auxiliary views, sections and assemblies Completed |
Evidence:
|
Draw sections through engineering components incorporating correct use of cutting plane symbols and conventions Completed |
Evidence:
|
Include appropriate symbols for limits and fits, surface texture and geometric tolerances Completed |
Evidence:
|
Resolve problems in consultation with a supervisor Completed |
Evidence:
|
Check drawing compliance with work instructions and specifications Completed |
Evidence:
|
Select physical dimensions and produce engineering parts list
|
|
Select components and/or materials from supplier or manufacturer catalogues using predetermined design specifications according to work requirements Completed |
Evidence:
|
Produce an engineering parts list in accordance with SOPs Completed |
Evidence:
|
Complete drawing documentation
|
|
Obtain approval for drawings and/or parts list Completed |
Evidence:
|
Store approved drawings and/or parts lists Completed |
Evidence:
|
Catalogue and issue drawing and documentation in accordance with SOPs Completed |
Evidence:
|