The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine LP gas system requirements
|
|
Use appropriate personal protective equipment and read and interpret any safety information relevant to the job Completed |
Evidence:
|
Obtain and interpret plans/specifications Completed |
Evidence:
|
Identify and adhere to quality assurance requirements for enterprise operations Completed |
Evidence:
|
Determine gas load/design requirements from design drawing or specifications Completed |
Evidence:
|
Calculate storage capacity using recognised formulae or tables to ensure adequacy for the required load and compliance with standards and job requirements Completed |
Evidence:
|
Identify appropriate regulator and piping in terms of size, connection sizes and capacity in accordance with standards and enterprise requirements Completed |
Evidence:
|
Check that piping selected provides minimum inlet pressure to each appliance and is appropriate for the dimensions and loads given in the design drawings or instructions Completed |
Evidence:
|
Identify location of cylinders, appliances and piping set-out according to job requirements, standards and enterprise requirements Completed |
Evidence:
|
Estimate quantity of piping, components and fittings in accordance with standards and enterprise requirements Completed |
Evidence:
|
Check that type of system selected (one or two cylinders) is appropriate for given design information Completed |
Evidence:
|
Prepare for installation
|
|
Estimate required materials, equipment, appliances and cylinders from design drawing or on-site dimensions, and check for compliance with docket/order form and confirm acceptable condition Completed |
Evidence:
|
Identify and select appropriate tools and equipment for the installation Completed |
Evidence:
|
Use appropriate personal protective equipment, and read and interpret any safety information relevant to the job Completed |
Evidence:
|
Set out the piping system in accordance with design drawing or instructions, standards and enterprise requirements Completed |
Evidence:
|
Install the system
|
|
Install cylinders, regulators, associated pipework, appliances and fixings, including ventilation, in accordance with job requirements, standards and enterprise procedures Completed |
Evidence:
|
Locate and fit consumer instruction plates and labels in accordance with regulatory requirements, standards and enterprise requirements Completed |
Evidence:
|
Test the system
|
|
Adjust regulator to provide flow pressure in accordance with standards and enterprise requirements Completed |
Evidence:
|
Select test apparatus appropriate for the work Completed |
Evidence:
|
Test the system, including ventilation, in accordance with standards and enterprise requirements Completed |
Evidence:
|
Adjust the system to provide the required flow pressure in accordance with standards and enterprise requirements Completed |
Evidence:
|
Record test data in the format required by relevant regulatory and enterprise requirements Completed |
Evidence:
|
Finalise the job
|
|
Assess job against the requirements of the job specification Completed |
Evidence:
|
Conduct a final inspection in accordance with enterprise quality standards and requirements Completed |
Evidence:
|
Complete any paperwork required in accordance with enterprise requirements Completed |
Evidence:
|
Complete required clean-up procedures Completed |
Evidence:
|