Evidence Guide: MSFFL1001 - Complete simple floor covering installation

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL1001 - Complete simple floor covering installation

What evidence can you provide to prove your understanding of each of the following citeria?

Lay out materials

  1. Plans and/or drawings are read and interpreted
  2. Work health and safety (WHS) requirements, including personal protection needs, are observed throughout the work
  3. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  4. Suitable adhesives, trims and accessories are selected if required
  5. Materials are laid out to meet specification requirements and minimise waste and joins
Plans and/or drawings are read and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS) requirements, including personal protection needs, are observed throughout the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable adhesives, trims and accessories are selected if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials are laid out to meet specification requirements and minimise waste and joins

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare materials for installation

  1. Sequence of work is planned to ensure lay out and fixing is in logical order
  2. Underlay is cut to specification
  3. Materials are cut to shape, length and size for final laying
  4. Adhesives and edge strips are prepared for use as required
Sequence of work is planned to ensure lay out and fixing is in logical order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Underlay is cut to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials are cut to shape, length and size for final laying

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhesives and edge strips are prepared for use as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay flooring

  1. Instructions and sequence for laying and fixing are followed
  2. Appropriate underlay is laid according to manufacturer recommendations
  3. Materials for fixing are organised and used in accordance with relevant safety management requirements
  4. Fixing methods and equipment are used following manufacturer recommendations
  5. Finished job is inspected and any imperfections are rectified following workplace procedures
Instructions and sequence for laying and fixing are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate underlay is laid according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials for fixing are organised and used in accordance with relevant safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fixing methods and equipment are used following manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished job is inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Lay out materials

1.1

Plans and/or drawings are read and interpreted

1.2

Work health and safety (WHS) requirements, including personal protection needs, are observed throughout the work

1.3

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.4

Suitable adhesives, trims and accessories are selected if required

1.5

Materials are laid out to meet specification requirements and minimise waste and joins

2

Prepare materials for installation

2.1

Sequence of work is planned to ensure lay out and fixing is in logical order

2.2

Underlay is cut to specification

2.3

Materials are cut to shape, length and size for final laying

2.4

Adhesives and edge strips are prepared for use as required

3

Lay flooring

3.1

Instructions and sequence for laying and fixing are followed

3.2

Appropriate underlay is laid according to manufacturer recommendations

3.3

Materials for fixing are organised and used in accordance with relevant safety management requirements

3.4

Fixing methods and equipment are used following manufacturer recommendations

3.5

Finished job is inspected and any imperfections are rectified following workplace procedures

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Lay out materials

1.1

Plans and/or drawings are read and interpreted

1.2

Work health and safety (WHS) requirements, including personal protection needs, are observed throughout the work

1.3

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.4

Suitable adhesives, trims and accessories are selected if required

1.5

Materials are laid out to meet specification requirements and minimise waste and joins

2

Prepare materials for installation

2.1

Sequence of work is planned to ensure lay out and fixing is in logical order

2.2

Underlay is cut to specification

2.3

Materials are cut to shape, length and size for final laying

2.4

Adhesives and edge strips are prepared for use as required

3

Lay flooring

3.1

Instructions and sequence for laying and fixing are followed

3.2

Appropriate underlay is laid according to manufacturer recommendations

3.3

Materials for fixing are organised and used in accordance with relevant safety management requirements

3.4

Fixing methods and equipment are used following manufacturer recommendations

3.5

Finished job is inspected and any imperfections are rectified following workplace procedures

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Apply ventilation standards

Complete a minimum of one (1) simple floor covering installation, which may be either timber, carpet or resilient flooring

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

Types, characteristics, uses and limitations of flooring materials

Types and uses of installation tools and equipment

Types, characteristics, uses and limitations of fixing methods and adhesives

Types, characteristics, uses and limitations of underlays

Workplace safety system requirements related to flooring installation

Work flow in relation to flooring installation operations

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

this unit is designed for a VET in Schools or equivalent program where the level of supervision is likely to be more direct than under normal working conditions

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individual to demonstrate some discretion, judgement and problem solving

simple floor covering contexts include those where:

sub-floor preparations are not required or have been completed

the area to be covered is rectangular or square

no pattern, border design or colour matching is required

Timber flooring includes:

floating floor

strip timber flooring (non-structural)

parquetry and cork tiles

Carpet flooring includes:

tufted carpet

woven carpet

needle punch carpet and fusion bonded carpe

Resilient flooring includes:

homogenous/heterogeneous backed PVC

linoleum sheet

rubber sheet and composition vinyl

Tools and equipment for timber floor covering installation include:

drop saw

jig saw

hand saw

undercut saw

plunge saw

nail gun

straight edge

cramps

clamps

hammer

bar scriber

tape measure and utility knife

Tools and equipment for carpet floor covering installation include:

carpet knee kicker

power stretcher

carpet wall trimmer

trolley

hammer

trimming knife

spiked carpet roller

weight or seam roller

awl

carpet spreader

carpet shears

napping shears and tape measure

Tools and equipment for resilient floor covering installation include:

utility knife

straight edge

square

chalk and chalk-line

tape measure

hacksaw

serrated trowel

hammer

scribing bar

divider

roller

gas bottle and gun

rubber mallet

paint brush and bucket

spatula knife

trolley and wall trimmer

Materials include:

flooring materials

underlay

edge strips

reducing strips

tapes

adhesives

adhesive tapes

skirting

domestic carpet gripper strips

heat seam tape

hessian tape and thread

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures