Evidence Guide: MSFFL3003 - Inspect sub-floors

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3003 - Inspect sub-floors

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for work

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to the inspection of sub-floors are verified and complied with
  2. Customer enquiry and relevant information is consulted to determine the type of proposed flooring operation and other work requirements
  3. Floor surface requirements for the proposed coverings are determined from manufacturer or workplace information
  4. Tools, equipment and required materials are obtained and prepared for the work
Applicable work health and safety (WHS), legislative and organisational requirements relevant to the inspection of sub-floors are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Customer enquiry and relevant information is consulted to determine the type of proposed flooring operation and other work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Floor surface requirements for the proposed coverings are determined from manufacturer or workplace information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and required materials are obtained and prepared for the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection of timber flooring

  1. The type of floor construction materials and the building floor structure and substructure are identified
  2. Datum lines to confirm floor fall, dips and irregularities and finished floor height in relation to other floor coverings and door clearances are run and checked to confirm dimensions
  3. Moisture testing is completed in accordance with the approved process and standard
  4. Timber sub-flooring inspections are completed to identify irregularities
  5. Ventilation flow is confirmed and irregularities noted
  6. Floor joists, bearers and stumps are checked for irregularities
The type of floor construction materials and the building floor structure and substructure are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Datum lines to confirm floor fall, dips and irregularities and finished floor height in relation to other floor coverings and door clearances are run and checked to confirm dimensions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Moisture testing is completed in accordance with the approved process and standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber sub-flooring inspections are completed to identify irregularities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ventilation flow is confirmed and irregularities noted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Floor joists, bearers and stumps are checked for irregularities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection of concrete flooring

  1. The type of floor construction materials and the building floor structure and substructure are identified
  2. Datum lines are run and checked to confirm dimensions
  3. Moisture testing is completed in accordance with the approved process and standard
  4. Concrete sub-floor inspections are completed to identify irregularities
  5. Expansion joints are inspected to ensure they are clean and unobstructed
The type of floor construction materials and the building floor structure and substructure are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Datum lines are run and checked to confirm dimensions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Moisture testing is completed in accordance with the approved process and standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Concrete sub-floor inspections are completed to identify irregularities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Expansion joints are inspected to ensure they are clean and unobstructed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify findings of inspection

  1. Notification of the findings of the inspection is completed in accordance with current and relevant standards
  2. Copies of the notification are sent to appropriate personnel and suitably filed following workplace procedures
Notification of the findings of the inspection is completed in accordance with current and relevant standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Copies of the notification are sent to appropriate personnel and suitably filed following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to the inspection of sub-floors are verified and complied with

1.2

Customer enquiry and relevant information is consulted to determine the type of proposed flooring operation and other work requirements

1.3

Floor surface requirements for the proposed coverings are determined from manufacturer or workplace information

1.4

Tools, equipment and required materials are obtained and prepared for the work

2

Conduct inspection of timber flooring

2.1

The type of floor construction materials and the building floor structure and substructure are identified

2.2

Datum lines to confirm floor fall, dips and irregularities and finished floor height in relation to other floor coverings and door clearances are run and checked to confirm dimensions

2.3

Moisture testing is completed in accordance with the approved process and standard

2.4

Timber sub-flooring inspections are completed to identify irregularities

2.5

Ventilation flow is confirmed and irregularities noted

2.6

Floor joists, bearers and stumps are checked for irregularities

3

Conduct inspection of concrete flooring

3.1

The type of floor construction materials and the building floor structure and substructure are identified

3.2

Datum lines are run and checked to confirm dimensions

3.3

Moisture testing is completed in accordance with the approved process and standard

3.4

Concrete sub-floor inspections are completed to identify irregularities

3.5

Expansion joints are inspected to ensure they are clean and unobstructed

4

Notify findings of inspection

4.1

Notification of the findings of the inspection is completed in accordance with current and relevant standards

4.2

Copies of the notification are sent to appropriate personnel and suitably filed following workplace procedures

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to the inspection of sub-floors are verified and complied with

1.2

Customer enquiry and relevant information is consulted to determine the type of proposed flooring operation and other work requirements

1.3

Floor surface requirements for the proposed coverings are determined from manufacturer or workplace information

1.4

Tools, equipment and required materials are obtained and prepared for the work

2

Conduct inspection of timber flooring

2.1

The type of floor construction materials and the building floor structure and substructure are identified

2.2

Datum lines to confirm floor fall, dips and irregularities and finished floor height in relation to other floor coverings and door clearances are run and checked to confirm dimensions

2.3

Moisture testing is completed in accordance with the approved process and standard

2.4

Timber sub-flooring inspections are completed to identify irregularities

2.5

Ventilation flow is confirmed and irregularities noted

2.6

Floor joists, bearers and stumps are checked for irregularities

3

Conduct inspection of concrete flooring

3.1

The type of floor construction materials and the building floor structure and substructure are identified

3.2

Datum lines are run and checked to confirm dimensions

3.3

Moisture testing is completed in accordance with the approved process and standard

3.4

Concrete sub-floor inspections are completed to identify irregularities

3.5

Expansion joints are inspected to ensure they are clean and unobstructed

4

Notify findings of inspection

4.1

Notification of the findings of the inspection is completed in accordance with current and relevant standards

4.2

Copies of the notification are sent to appropriate personnel and suitably filed following workplace procedures

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of:

one (1) timber sub-floor inspection and written notification

one (1) concrete sub-floor inspection and written notification

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

Workplace safety system requirements related to floor inspection

Type, characteristics and defects of:

timber sub-floor structures

concrete sub-floor structures

Types and uses of inspection tools and equipment and procedures for their safe use, operation and maintenance

Requirements for floor condition for floor coverings

Characteristics and requirements of sub-floor preparation

Work flow in relation to inspection processes and procedures

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Tools and equipment include:

straight edges (150 mm – 3 m)

spirit level

string line and chalk line

electrical resistance meter

tape measure

laser level

dumpy level

measuring pole

water level

hygrometer

thermometer probe

acid and alkaline testing equipment

electric drill

masonry drill bits

Materials include:

timber strip flooring

construction sheet flooring

concrete floors

above grade, on grade and below grade floors

Timber sub-flooring inspections include:

tests for moisture content

protruding nails

loose metal and other objects

cracked, loose, rotting or damaged boards

insect attack

cross-flow ventilation

Concrete sub-floor inspections include:

checks for any protruding obstacles

cracks or damage

moisture

damage to expansion joints

concrete surface for weakness or damage

the presence of during agents

Inspection notifications include:

the type of the inspection completed, testing methods used, inspection findings, suggested remedies to any faults identified and recommendations for floor coverings or finishing

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures