NTISthis.com

Evidence Guide: MSFFL3008 - Install patterned carpet floor coverings

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3008 - Install patterned carpet floor coverings

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for installation

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to install patterned carpet floor covering are verified and complied with
  2. Instructions and/or plans are read and interpreted to identify the process required to complete work tasks
  3. Resources required in terms of labour, equipment, materials, transport, site loading and hoisting, storage facilities, air conditioning, heating, lighting, power supply, security and time are assessed
  4. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  5. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
Applicable work health and safety (WHS), legislative and organisational requirements relevant to install patterned carpet floor covering are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources required in terms of labour, equipment, materials, transport, site loading and hoisting, storage facilities, air conditioning, heating, lighting, power supply, security and time are assessed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out materials

  1. Carpet to be installed is checked against work order
  2. Patterned carpet floor coverings are acclimatised according to manufacturer recommendations
  3. Type of perimeter finishing, joining materials, gripper strip, metal mouldings and cover strips are selected following specification or work order
  4. Underlay, gripper strips and metal mouldings are inspected to confirm correct fitting
  5. Work area is cleared of scraps or other contaminants
  6. Work lines and starting point are established
Carpet to be installed is checked against work order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Patterned carpet floor coverings are acclimatised according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Type of perimeter finishing, joining materials, gripper strip, metal mouldings and cover strips are selected following specification or work order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Underlay, gripper strips and metal mouldings are inspected to confirm correct fitting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleared of scraps or other contaminants

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work lines and starting point are established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay patterned floor coverings

  1. Instructions and sequence for laying and fixing are followed
  2. Carpet pieces are laid out and checked for size and direction of pile
  3. Stretching equipment, joining and fixing methods are used following manufacturer instructions and Australian Standards
  4. Cover and finishing strips are suitably fixed for the type of sub-floor
  5. Protective coverings are installed as specified
  6. Finished work is inspected for compliance with work order, workplace and Australian Standards of finish
Instructions and sequence for laying and fixing are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carpet pieces are laid out and checked for size and direction of pile

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stretching equipment, joining and fixing methods are used following manufacturer instructions and Australian Standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cover and finishing strips are suitably fixed for the type of sub-floor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protective coverings are installed as specified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished work is inspected for compliance with work order, workplace and Australian Standards of finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to install patterned carpet floor covering are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

Resources required in terms of labour, equipment, materials, transport, site loading and hoisting, storage facilities, air conditioning, heating, lighting, power supply, security and time are assessed

1.4

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.5

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out materials

2.1

Carpet to be installed is checked against work order

2.2

Patterned carpet floor coverings are acclimatised according to manufacturer recommendations

2.3

Type of perimeter finishing, joining materials, gripper strip, metal mouldings and cover strips are selected following specification or work order

2.4

Underlay, gripper strips and metal mouldings are inspected to confirm correct fitting

2.5

Work area is cleared of scraps or other contaminants

2.6

Work lines and starting point are established

3

Lay patterned floor coverings

3.1

Instructions and sequence for laying and fixing are followed

3.2

Carpet pieces are laid out and checked for size and direction of pile

3.3

Stretching equipment, joining and fixing methods are used following manufacturer instructions and Australian Standards

3.4

Cover and finishing strips are suitably fixed for the type of sub-floor

3.5

Protective coverings are installed as specified

3.6

Finished work is inspected for compliance with work order, workplace and Australian Standards of finish

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to install patterned carpet floor covering are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3

Resources required in terms of labour, equipment, materials, transport, site loading and hoisting, storage facilities, air conditioning, heating, lighting, power supply, security and time are assessed

1.4

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.5

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Set out materials

2.1

Carpet to be installed is checked against work order

2.2

Patterned carpet floor coverings are acclimatised according to manufacturer recommendations

2.3

Type of perimeter finishing, joining materials, gripper strip, metal mouldings and cover strips are selected following specification or work order

2.4

Underlay, gripper strips and metal mouldings are inspected to confirm correct fitting

2.5

Work area is cleared of scraps or other contaminants

2.6

Work lines and starting point are established

3

Lay patterned floor coverings

3.1

Instructions and sequence for laying and fixing are followed

3.2

Carpet pieces are laid out and checked for size and direction of pile

3.3

Stretching equipment, joining and fixing methods are used following manufacturer instructions and Australian Standards

3.4

Cover and finishing strips are suitably fixed for the type of sub-floor

3.5

Protective coverings are installed as specified

3.6

Finished work is inspected for compliance with work order, workplace and Australian Standards of finish

4

Complete housekeeping

4.1

Unused materials are stored or recycled as required

4.2

Tools and equipment are cleaned and stored appropriately

4.3

Work area is cleaned and rubbish disposed of appropriately

4.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Install woven patterned carpet requiring pattern matching at seams and cross joints using the carpet gripper strip installation system

Install tufted patterned carpet requiring pattern matching at seams and cross joints using the carpet gripper strip installation system

Install tufted patterned carpet using adhesive bonded methods of installation including pattern matching at seams and cross joints

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to the installation of patterned carpet

Organisational and site standards, requirements, policies and procedures for the installation of patterned carpet

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Procedures for the recording, reporting and maintenance of workplace records and information

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individual to demonstrate some discretion, judgement and problem solving

Patterned carpet floor coverings include:

tufted carpet

woven carpet

fusion-bonded carpet

Tools and equipment include:

carpet knee kicker

power stretcher

carpet stair tool

hand trucks

carpet trolleys

hammer

utility knife

hook knife

carpet wall trimmer

heat seam iron

spiked carpet roller

weight or seam roller

awl

carpet spreader

carpet shears

napping shears

loop pile cutter

cushion backed cutter

moulding lifter

sewing needle

Materials include:

commercial architectural carpet gripper strips

metal mouldings and PVC trims

heat seam tape

hessian tape

thread

adhesives

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures