The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3039 - Install strip timber flooring onto plywood

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for work

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installation of strip timber flooring onto plywood are verified and complied with
  2. Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  3. Sub-floor condition is assessed for suitability for installation of strip timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations
  4. Suitable moisture membrane, fixings, adhesives, trims and accessories are selected as required.
  5. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  6. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installation of strip timber flooring onto plywood are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sub-floor condition is assessed for suitability for installation of strip timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable moisture membrane, fixings, adhesives, trims and accessories are selected as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay moisture membrane

  1. Instructions and sequence for laying and fixing are followed
  2. Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining
  3. Moisture proof membrane is fixed following manufacturer recommendations and Australian Standards
Instructions and sequence for laying and fixing are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Moisture proof membrane is fixed following manufacturer recommendations and Australian Standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut and fix plywood underlay

  1. Timber flooring to be installed is checked against order
  2. Timber flooring is acclimatised according to manufacturer recommendations
  3. Area to be covered is measured, working lines and starting point are established
  4. Plywood underlay for fixing is organised and used in accordance with relevant safety management requirements
  5. Plywood underlay is accurately and clearly marked for cutting
  6. Plywood underlay is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste
  7. Fixings are prepared for use as required
  8. Plywood underlay is fixed using methods and equipment that follows manufacturer recommendations
Timber flooring to be installed is checked against order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber flooring is acclimatised according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Area to be covered is measured, working lines and starting point are established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plywood underlay for fixing is organised and used in accordance with relevant safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plywood underlay is accurately and clearly marked for cutting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plywood underlay is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fixings are prepared for use as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plywood underlay is fixed using methods and equipment that follows manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut and fix timber flooring

  1. Instructions and sequence for laying and fixing timber flooring are followed
  2. Work lines and starting point are established
  3. Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate
  4. The aesthetics of the materials are maximised, where appropriate, matching grains and colours
  5. Fixing methods and equipment are used following manufacturer recommendations
  6. Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste
Instructions and sequence for laying and fixing timber flooring are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work lines and starting point are established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The aesthetics of the materials are maximised, where appropriate, matching grains and colours

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fixing methods and equipment are used following manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay strip timber flooring

  1. Materials for fixing are organised and used in accordance with relevant safety management requirements
  2. Fixing methods and equipment are used following manufacturer recommendations and Australian Standards
  3. Appropriate field and perimeter expansion joints are allowed
  4. Skirting boards or cover trims are fitted and finished
  5. Finished job is inspected and any imperfections are rectified following workplace procedures
Materials for fixing are organised and used in accordance with relevant safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fixing methods and equipment are used following manufacturer recommendations and Australian Standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate field and perimeter expansion joints are allowed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Skirting boards or cover trims are fitted and finished

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished job is inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installation of strip timber flooring onto plywood are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Sub-floor condition is assessed for suitability for installation of strip timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations

1.4

Suitable moisture membrane, fixings, adhesives, trims and accessories are selected as required.

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Lay moisture membrane

2.1

Instructions and sequence for laying and fixing are followed

2.2

Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining

2.3

Moisture proof membrane is fixed following manufacturer recommendations and Australian Standards

3

Cut and fix plywood underlay

3.1

Timber flooring to be installed is checked against order

3.2

Timber flooring is acclimatised according to manufacturer recommendations

3.3

Area to be covered is measured, working lines and starting point are established

3.4

Plywood underlay for fixing is organised and used in accordance with relevant safety management requirements

3.5

Plywood underlay is accurately and clearly marked for cutting

3.6

Plywood underlay is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

3.7

Fixings are prepared for use as required

3.8

Plywood underlay is fixed using methods and equipment that follows manufacturer recommendations

4

Cut and fix timber flooring

4.1

Instructions and sequence for laying and fixing timber flooring are followed

4.2

Work lines and starting point are established

4.3

Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

4.4

The aesthetics of the materials are maximised, where appropriate, matching grains and colours

4.5

Fixing methods and equipment are used following manufacturer recommendations

4.6

Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

5

Lay strip timber flooring

5.1

Materials for fixing are organised and used in accordance with relevant safety management requirements

5.2

Fixing methods and equipment are used following manufacturer recommendations and Australian Standards

5.3

Appropriate field and perimeter expansion joints are allowed

5.4

Skirting boards or cover trims are fitted and finished

5.5

Finished job is inspected and any imperfections are rectified following workplace procedures

6

Complete housekeeping

6.1

Unused materials are stored or recycled as required

6.2

Tools and equipment are cleaned and stored appropriately

6.3

Work area is cleaned and rubbish disposed of appropriately

6.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installation of strip timber flooring onto plywood are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Sub-floor condition is assessed for suitability for installation of strip timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations

1.4

Suitable moisture membrane, fixings, adhesives, trims and accessories are selected as required.

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Lay moisture membrane

2.1

Instructions and sequence for laying and fixing are followed

2.2

Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining

2.3

Moisture proof membrane is fixed following manufacturer recommendations and Australian Standards

3

Cut and fix plywood underlay

3.1

Timber flooring to be installed is checked against order

3.2

Timber flooring is acclimatised according to manufacturer recommendations

3.3

Area to be covered is measured, working lines and starting point are established

3.4

Plywood underlay for fixing is organised and used in accordance with relevant safety management requirements

3.5

Plywood underlay is accurately and clearly marked for cutting

3.6

Plywood underlay is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

3.7

Fixings are prepared for use as required

3.8

Plywood underlay is fixed using methods and equipment that follows manufacturer recommendations

4

Cut and fix timber flooring

4.1

Instructions and sequence for laying and fixing timber flooring are followed

4.2

Work lines and starting point are established

4.3

Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate

4.4

The aesthetics of the materials are maximised, where appropriate, matching grains and colours

4.5

Fixing methods and equipment are used following manufacturer recommendations

4.6

Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste

5

Lay strip timber flooring

5.1

Materials for fixing are organised and used in accordance with relevant safety management requirements

5.2

Fixing methods and equipment are used following manufacturer recommendations and Australian Standards

5.3

Appropriate field and perimeter expansion joints are allowed

5.4

Skirting boards or cover trims are fitted and finished

5.5

Finished job is inspected and any imperfections are rectified following workplace procedures

6

Complete housekeeping

6.1

Unused materials are stored or recycled as required

6.2

Tools and equipment are cleaned and stored appropriately

6.3

Work area is cleaned and rubbish disposed of appropriately

6.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of one (1) installation of strip timber flooring onto plywood underlay fixed to a concrete sub-floor

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to installation of strip timber flooring onto plywood underlay

Organisational and site standards, requirements, policies and procedures for the installation of strip timber flooring onto plywood underlay

Type, characteristics, uses and limitations of:

strip timber flooring installed onto plywood underlay

installation adhesives

plywood underlay

IS0 Type 5 system for product reliability to AS/NZS 2269.0:2012 Plywood - Structural - Specifications

Types and uses of tools and equipment used during the installation of strip timber flooring onto plywood underlay

Basic wood working techniques relevant to the installation of timber strip flooring onto plywood underlay

Workplace safety system requirements relevant to the installation of strip timber flooring onto plywood underlay

Work flow in relation to the laying of strip timber flooring onto plywood underlay operations

Characteristics and requirements of sub-floor preparation

Environmental protection requirements

Appropriate mathematical procedures for estimation and measurement

Procedures for the recording, reporting and maintenance of workplace records and information.

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Strip timber flooring onto plywood underlay includes:

tongue and groove strip timber flooring on plywood which may be over joists, concrete or a sub-floor to either raise a floor or correct the level of a floor

Adhesives include:

polyvinyl alcohol (PVA)

polyurethane

elastomeric

Tools and equipment include:

drop saw

jig saw

hand saw

undercut saw

hammer

circular saw

bench saw

straight edge

cramps

clamps

staple gun

secret nailer

bar scriber

utility knife

Materials include:

flooring materials

strip timber floor boards

plywood underlay

edge strips

timber and metal mouldings

tapes

adhesives

metal fixings

ventilated skirtings

Plywood underlay includes:

timber plywood underlay manufactured under a JAS-ANZ accredited product certification scheme meeting the internationally recognised IS0 Type system for product reliability to AS/NZS 2269.0:2012 Plywood - Structural - Specifications

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures