NTISthis.com

Evidence Guide: MSFFL3044 - Sand cork flooring

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3044 - Sand cork flooring

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for the work

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to sanding cork flooring are verified and complied with
  2. Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  3. Cork flooring is inspected for contamination, moisture content and suitability for fine sanding operations and any pre-sanding tasks are completed
  4. Cork flooring condition is assessed and the extent of fine sanding required to meet job specifications is confirmed
  5. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  6. The job site is isolated and/or encapsulated to contain dust fallout from sanding operation
  7. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
Applicable work health and safety (WHS), legislative and organisational requirements relevant to sanding cork flooring are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cork flooring is inspected for contamination, moisture content and suitability for fine sanding operations and any pre-sanding tasks are completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cork flooring condition is assessed and the extent of fine sanding required to meet job specifications is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The job site is isolated and/or encapsulated to contain dust fallout from sanding operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct finish sandingoperations

  1. Finishing sanding equipment, including split drum/belt sanding equipment, is set up in accordance with manufacturer instructions and operating procedures
  2. Emergency stops, gauges, guards and controls are identified and checked
  3. Equipment settings and adjustments are made and checked
  4. Sanding papers are selected
  5. Trial runs are conducted to check machine operations and quality of finished work
  6. Sanding papers are attached, routinely checked and changed as required
  7. Sanding is completed systematically and effectively within the minimum required timeframe
  8. Routine lubrication and adjustments to the equipment are completed as required
  9. Finish sanded cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures
Finishing sanding equipment, including split drum/belt sanding equipment, is set up in accordance with manufacturer instructions and operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emergency stops, gauges, guards and controls are identified and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment settings and adjustments are made and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial runs are conducted to check machine operations and quality of finished work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are attached, routinely checked and changed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding is completed systematically and effectively within the minimum required timeframe

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine lubrication and adjustments to the equipment are completed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish sanded cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct fine sanding operations

  1. Rotary/orbital sanding equipment is set up in accordance with manufacturer instructions and operating procedures
  2. Emergency stops, gauges, guards and controls are identified and checked
  3. Equipment settings and adjustments are made and checked
  4. Sanding papers are selected
  5. Trial runs are conducted to check machine operations and quality of finished work
  6. Sanding papers are attached, routinely checked and changed as required
  7. Cork sanding is completed systematically and effectively within the minimum required timeframe
  8. Fine sanded cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures
Rotary/orbital sanding equipment is set up in accordance with manufacturer instructions and operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emergency stops, gauges, guards and controls are identified and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment settings and adjustments are made and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial runs are conducted to check machine operations and quality of finished work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are attached, routinely checked and changed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cork sanding is completed systematically and effectively within the minimum required timeframe

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fine sanded cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct edge sanding operations

  1. Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures
  2. Emergency stops, gauges, guards and controls are identified and checked
  3. Equipment settings and adjustments are made and checked
  4. Sanding papers are selected
  5. Trial runs are conducted to check machine operations and quality of finished work
  6. Sanding papers are attached, routinely checked and changed as required
  7. The edge and difficult to get to areas are sanded and completed systematically to blend into the body of the sanded cork floor
  8. Routine lubrication and adjustments to the equipment are completed as required
  9. Finished cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures
Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emergency stops, gauges, guards and controls are identified and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment settings and adjustments are made and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial runs are conducted to check machine operations and quality of finished work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are attached, routinely checked and changed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The edge and difficult to get to areas are sanded and completed systematically to blend into the body of the sanded cork floor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine lubrication and adjustments to the equipment are completed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for the work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to sanding cork flooring are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Cork flooring is inspected for contamination, moisture content and suitability for fine sanding operations and any pre-sanding tasks are completed

1.4

Cork flooring condition is assessed and the extent of fine sanding required to meet job specifications is confirmed

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

The job site is isolated and/or encapsulated to contain dust fallout from sanding operation

1.7

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Conduct finish sandingoperations

2.1

Finishing sanding equipment, including split drum/belt sanding equipment, is set up in accordance with manufacturer instructions and operating procedures

2.2

Emergency stops, gauges, guards and controls are identified and checked

2.3

Equipment settings and adjustments are made and checked

2.4

Sanding papers are selected

2.5

Trial runs are conducted to check machine operations and quality of finished work

2.6

Sanding papers are attached, routinely checked and changed as required

2.7

Sanding is completed systematically and effectively within the minimum required timeframe

2.8

Routine lubrication and adjustments to the equipment are completed as required

2.9

Finish sanded cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

3

Conduct fine sanding operations

3.1

Rotary/orbital sanding equipment is set up in accordance with manufacturer instructions and operating procedures

3.2

Emergency stops, gauges, guards and controls are identified and checked

3.3

Equipment settings and adjustments are made and checked

3.4

Sanding papers are selected

3.5

Trial runs are conducted to check machine operations and quality of finished work

3.6

Sanding papers are attached, routinely checked and changed as required

3.7

Cork sanding is completed systematically and effectively within the minimum required timeframe

3.8

Fine sanded cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

4

Conduct edge sanding operations

4.1

Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures

4.2

Emergency stops, gauges, guards and controls are identified and checked

4.3

Equipment settings and adjustments are made and checked

4.4

Sanding papers are selected

4.5

Trial runs are conducted to check machine operations and quality of finished work

4.6

Sanding papers are attached, routinely checked and changed as required

4.7

The edge and difficult to get to areas are sanded and completed systematically to blend into the body of the sanded cork floor

4.8

Routine lubrication and adjustments to the equipment are completed as required

4.9

Finished cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

5

Complete housekeeping

5.1

Unused materials are stored or recycled as required

5.2

Tools and equipment are cleaned and stored appropriately

5.3

Work area is cleaned and rubbish disposed of appropriately

5.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for the work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to sanding cork flooring are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Cork flooring is inspected for contamination, moisture content and suitability for fine sanding operations and any pre-sanding tasks are completed

1.4

Cork flooring condition is assessed and the extent of fine sanding required to meet job specifications is confirmed

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

The job site is isolated and/or encapsulated to contain dust fallout from sanding operation

1.7

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Conduct finish sandingoperations

2.1

Finishing sanding equipment, including split drum/belt sanding equipment, is set up in accordance with manufacturer instructions and operating procedures

2.2

Emergency stops, gauges, guards and controls are identified and checked

2.3

Equipment settings and adjustments are made and checked

2.4

Sanding papers are selected

2.5

Trial runs are conducted to check machine operations and quality of finished work

2.6

Sanding papers are attached, routinely checked and changed as required

2.7

Sanding is completed systematically and effectively within the minimum required timeframe

2.8

Routine lubrication and adjustments to the equipment are completed as required

2.9

Finish sanded cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

3

Conduct fine sanding operations

3.1

Rotary/orbital sanding equipment is set up in accordance with manufacturer instructions and operating procedures

3.2

Emergency stops, gauges, guards and controls are identified and checked

3.3

Equipment settings and adjustments are made and checked

3.4

Sanding papers are selected

3.5

Trial runs are conducted to check machine operations and quality of finished work

3.6

Sanding papers are attached, routinely checked and changed as required

3.7

Cork sanding is completed systematically and effectively within the minimum required timeframe

3.8

Fine sanded cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

4

Conduct edge sanding operations

4.1

Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures

4.2

Emergency stops, gauges, guards and controls are identified and checked

4.3

Equipment settings and adjustments are made and checked

4.4

Sanding papers are selected

4.5

Trial runs are conducted to check machine operations and quality of finished work

4.6

Sanding papers are attached, routinely checked and changed as required

4.7

The edge and difficult to get to areas are sanded and completed systematically to blend into the body of the sanded cork floor

4.8

Routine lubrication and adjustments to the equipment are completed as required

4.9

Finished cork flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

5

Complete housekeeping

5.1

Unused materials are stored or recycled as required

5.2

Tools and equipment are cleaned and stored appropriately

5.3

Work area is cleaned and rubbish disposed of appropriately

5.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Sand three (3) different types of cork floors from the following:

cork tiles

cork planks

pattered cork tiles (bevelled edge)

stained cork tiles

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to moisture suppressants and barrier systems for sanding cork flooring

Organisational and site standards, requirements, policies and procedures for sanding cork flooring

Characteristics of materials, products and defects

Set-up and operation of sanding equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Characteristics and requirements of sanding cork flooring

Type, characteristics, uses and limitations of sanding cork flooring

Types and uses of relevant tools and equipment used to conduct fine sanding operations

Workplace safety system requirements related to sanding cork flooring

Types of tools and equipment and procedures for their safe use, operation and maintenance

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Pre-sanding tasks include:

isolating and/or encapsulating the job site

nail punching

filling

scraping

sweeping

vacuuming

cleaning and removal of all foreign objects, such as nails, tacks and staples

Tools and equipment include:

hammer

scraper

nail punch

broom

vacuum

Materials include:

sanding belts

sanding paper

discs

oil and lubricants

cleaning materials

Finish sanding includes:

split drum and belt floor sanding machines using 60–100 grit papers

Finishing sanding equipment includes:

drum/belt sander

random orbital

rotary and edger sanders

finishing machines

Fine sanding includes:

rotary and orbital floor sanding machines using 100–200 grit paper

Edge sanding includes:

edge sanding machines both rotary and orbital using the full range of grit papers depending on the general floor sanding process

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures