NTISthis.com

Evidence Guide: MSFFL3045 - Sand and fill parquetry flooring

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3045 - Sand and fill parquetry flooring

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for the work

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to coarse, finish and fine sanding and filling parquetry flooring are verified and complied with
  2. Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  3. Parquetry flooring is inspected for contamination, moisture content and suitability for coarse, finish and fine sanding operations and any pre-sanding tasks are completed
  4. Parquetry flooring condition is assessed and the extent of coarse, finish and fine sanding and filling required to meet job specifications is confirmed
  5. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  6. The job site is isolated and/or encapsulated to contain dust fallout from sanding operation
  7. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
Applicable work health and safety (WHS), legislative and organisational requirements relevant to coarse, finish and fine sanding and filling parquetry flooring are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Parquetry flooring is inspected for contamination, moisture content and suitability for coarse, finish and fine sanding operations and any pre-sanding tasks are completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Parquetry flooring condition is assessed and the extent of coarse, finish and fine sanding and filling required to meet job specifications is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The job site is isolated and/or encapsulated to contain dust fallout from sanding operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct coarse sandingoperations

  1. Sanding equipment is set up in accordance with manufacturer instructions and operating procedures
  2. Emergency stops, gauges, guards and controls are identified and checked
  3. Equipment settings and adjustments are made and checked
  4. Sanding belts or papers are selected
  5. Trial runs are conducted to check machine operations and quality of finished work
  6. Sanding belts or papers are attached, routinely checked and changed as required
  7. Coarse sanding is completed systematically and effectively with the grain, against the grain and across the grain within the minimum required timeframe
  8. Routine lubrication and adjustments to the equipment are completed as required
  9. Coarse sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures
Sanding equipment is set up in accordance with manufacturer instructions and operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emergency stops, gauges, guards and controls are identified and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment settings and adjustments are made and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding belts or papers are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial runs are conducted to check machine operations and quality of finished work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding belts or papers are attached, routinely checked and changed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coarse sanding is completed systematically and effectively with the grain, against the grain and across the grain within the minimum required timeframe

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine lubrication and adjustments to the equipment are completed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coarse sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct edge sanding operations

  1. Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures
  2. Emergency stops, gauges, guards and controls are identified and checked
  3. Equipment settings and adjustments are made and checked
  4. Sanding papers are selected
  5. Trial runs are conducted to check machine operations and quality of finished work
  6. Sanding papers are attached, routinely checked and changed as required
  7. Edge sanding is completed systematically and effectively within the minimum required timeframe
  8. Routine lubrication and adjustments to the equipment are completed as required
  9. Edge sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures
Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emergency stops, gauges, guards and controls are identified and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment settings and adjustments are made and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial runs are conducted to check machine operations and quality of finished work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are attached, routinely checked and changed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Edge sanding is completed systematically and effectively within the minimum required timeframe

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine lubrication and adjustments to the equipment are completed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Edge sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct filling operations

  1. Surface to be filled is inspected and assessed as being ready for filling with the selected filler
  2. Work sequence is planned to ensure efficiency and quality of application
  3. Ventilation is checked before chemical fumes are released, and all WHS requirements are met, including use of personal protective equipment
  4. Environmental protection regulations are complied with
  5. Filling material is prepared in accordance with manufacturer specifications
  6. Trial applications of fillers are made to check equipment operation, materials consistency, viscosity and specified colour
  7. Faults and or inconsistencies in colour are identified and workplace procedures for rectification and adjustment are followed
  8. Filling material is applied in accordance with manufacturer recommendations
  9. Recommended drying times are observed before fine sanding
  10. Sanding between coats, where required, is carried out according to manufacturer recommendations
  11. Finished floors are inspected and approved for suitability for further processing
  12. Final finish meets the requirements of the job
Surface to be filled is inspected and assessed as being ready for filling with the selected filler

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work sequence is planned to ensure efficiency and quality of application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ventilation is checked before chemical fumes are released, and all WHS requirements are met, including use of personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental protection regulations are complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Filling material is prepared in accordance with manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial applications of fillers are made to check equipment operation, materials consistency, viscosity and specified colour

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faults and or inconsistencies in colour are identified and workplace procedures for rectification and adjustment are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Filling material is applied in accordance with manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recommended drying times are observed before fine sanding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding between coats, where required, is carried out according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished floors are inspected and approved for suitability for further processing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final finish meets the requirements of the job

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct fine sanding operations

  1. Fine sanding equipment is set up in accordance with manufacturer instructions and operating procedures
  2. Emergency stops, gauges, guards and controls are identified and checked
  3. Equipment settings and adjustments are made and checked
  4. Sanding papers are selected
  5. Trial runs are conducted to check machine operations and quality of finished work
  6. Sanding papers are attached, routinely checked and changed as required
  7. Fine sanding of the body and perimeter of the floor is completed systematically and effectively within the minimum required timeframe
  8. Fine sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures
Fine sanding equipment is set up in accordance with manufacturer instructions and operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emergency stops, gauges, guards and controls are identified and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment settings and adjustments are made and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial runs are conducted to check machine operations and quality of finished work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sanding papers are attached, routinely checked and changed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fine sanding of the body and perimeter of the floor is completed systematically and effectively within the minimum required timeframe

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fine sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Unused materials are stored or recycled as required
  2. Tools and equipment are cleaned and stored appropriately
  3. Work area is cleaned and rubbish disposed of appropriately
  4. Workplace documentation is completed
Unused materials are stored or recycled as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for the work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to coarse, finish and fine sanding and filling parquetry flooring are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Parquetry flooring is inspected for contamination, moisture content and suitability for coarse, finish and fine sanding operations and any pre-sanding tasks are completed

1.4

Parquetry flooring condition is assessed and the extent of coarse, finish and fine sanding and filling required to meet job specifications is confirmed

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

The job site is isolated and/or encapsulated to contain dust fallout from sanding operation

1.7

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Conduct coarse sandingoperations

2.1

Sanding equipment is set up in accordance with manufacturer instructions and operating procedures

2.2

Emergency stops, gauges, guards and controls are identified and checked

2.3

Equipment settings and adjustments are made and checked

2.4

Sanding belts or papers are selected

2.5

Trial runs are conducted to check machine operations and quality of finished work

2.6

Sanding belts or papers are attached, routinely checked and changed as required

2.7

Coarse sanding is completed systematically and effectively with the grain, against the grain and across the grain within the minimum required timeframe

2.8

Routine lubrication and adjustments to the equipment are completed as required

2.9

Coarse sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

3

Conduct edge sanding operations

3.1

Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures

3.2

Emergency stops, gauges, guards and controls are identified and checked

3.3

Equipment settings and adjustments are made and checked

3.4

Sanding papers are selected

3.5

Trial runs are conducted to check machine operations and quality of finished work

3.6

Sanding papers are attached, routinely checked and changed as required

3.7

Edge sanding is completed systematically and effectively within the minimum required timeframe

3.8

Routine lubrication and adjustments to the equipment are completed as required

3.9

Edge sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

4

Conduct filling operations

4.1

Surface to be filled is inspected and assessed as being ready for filling with the selected filler

4.2

Work sequence is planned to ensure efficiency and quality of application

4.3

Ventilation is checked before chemical fumes are released, and all WHS requirements are met, including use of personal protective equipment

4.4

Environmental protection regulations are complied with

4.5

Filling material is prepared in accordance with manufacturer specifications

4.6

Trial applications of fillers are made to check equipment operation, materials consistency, viscosity and specified colour

4.7

Faults and or inconsistencies in colour are identified and workplace procedures for rectification and adjustment are followed

4.8

Filling material is applied in accordance with manufacturer recommendations

4.9

Recommended drying times are observed before fine sanding

4.10

Sanding between coats, where required, is carried out according to manufacturer recommendations

4.11

Finished floors are inspected and approved for suitability for further processing

4.12

Final finish meets the requirements of the job

5

Conduct fine sanding operations

5.1

Fine sanding equipment is set up in accordance with manufacturer instructions and operating procedures

5.2

Emergency stops, gauges, guards and controls are identified and checked

5.3

Equipment settings and adjustments are made and checked

5.4

Sanding papers are selected

5.5

Trial runs are conducted to check machine operations and quality of finished work

5.6

Sanding papers are attached, routinely checked and changed as required

5.7

Fine sanding of the body and perimeter of the floor is completed systematically and effectively within the minimum required timeframe

5.8

Fine sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

6

Complete housekeeping

6.1

Unused materials are stored or recycled as required

6.2

Tools and equipment are cleaned and stored appropriately

6.3

Work area is cleaned and rubbish disposed of appropriately

6.4

Workplace documentation is completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for the work

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to coarse, finish and fine sanding and filling parquetry flooring are verified and complied with

1.2

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3

Parquetry flooring is inspected for contamination, moisture content and suitability for coarse, finish and fine sanding operations and any pre-sanding tasks are completed

1.4

Parquetry flooring condition is assessed and the extent of coarse, finish and fine sanding and filling required to meet job specifications is confirmed

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

The job site is isolated and/or encapsulated to contain dust fallout from sanding operation

1.7

Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2

Conduct coarse sandingoperations

2.1

Sanding equipment is set up in accordance with manufacturer instructions and operating procedures

2.2

Emergency stops, gauges, guards and controls are identified and checked

2.3

Equipment settings and adjustments are made and checked

2.4

Sanding belts or papers are selected

2.5

Trial runs are conducted to check machine operations and quality of finished work

2.6

Sanding belts or papers are attached, routinely checked and changed as required

2.7

Coarse sanding is completed systematically and effectively with the grain, against the grain and across the grain within the minimum required timeframe

2.8

Routine lubrication and adjustments to the equipment are completed as required

2.9

Coarse sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

3

Conduct edge sanding operations

3.1

Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures

3.2

Emergency stops, gauges, guards and controls are identified and checked

3.3

Equipment settings and adjustments are made and checked

3.4

Sanding papers are selected

3.5

Trial runs are conducted to check machine operations and quality of finished work

3.6

Sanding papers are attached, routinely checked and changed as required

3.7

Edge sanding is completed systematically and effectively within the minimum required timeframe

3.8

Routine lubrication and adjustments to the equipment are completed as required

3.9

Edge sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

4

Conduct filling operations

4.1

Surface to be filled is inspected and assessed as being ready for filling with the selected filler

4.2

Work sequence is planned to ensure efficiency and quality of application

4.3

Ventilation is checked before chemical fumes are released, and all WHS requirements are met, including use of personal protective equipment

4.4

Environmental protection regulations are complied with

4.5

Filling material is prepared in accordance with manufacturer specifications

4.6

Trial applications of fillers are made to check equipment operation, materials consistency, viscosity and specified colour

4.7

Faults and or inconsistencies in colour are identified and workplace procedures for rectification and adjustment are followed

4.8

Filling material is applied in accordance with manufacturer recommendations

4.9

Recommended drying times are observed before fine sanding

4.10

Sanding between coats, where required, is carried out according to manufacturer recommendations

4.11

Finished floors are inspected and approved for suitability for further processing

4.12

Final finish meets the requirements of the job

5

Conduct fine sanding operations

5.1

Fine sanding equipment is set up in accordance with manufacturer instructions and operating procedures

5.2

Emergency stops, gauges, guards and controls are identified and checked

5.3

Equipment settings and adjustments are made and checked

5.4

Sanding papers are selected

5.5

Trial runs are conducted to check machine operations and quality of finished work

5.6

Sanding papers are attached, routinely checked and changed as required

5.7

Fine sanding of the body and perimeter of the floor is completed systematically and effectively within the minimum required timeframe

5.8

Fine sanded parquetry flooring is cleaned, inspected and any imperfections are rectified following workplace procedures

6

Complete housekeeping

6.1

Unused materials are stored or recycled as required

6.2

Tools and equipment are cleaned and stored appropriately

6.3

Work area is cleaned and rubbish disposed of appropriately

6.4

Workplace documentation is completed

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Prepare two (2) different types of parquetry floors from the following list:

block (mandatory) and

mosaic or multi-directional patterned

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to fine sanding parquetry flooring

Organisational and site standards, requirements, policies and procedures for coarse, finish and fine sanding and filling parquetry flooring

Characteristics, requirements and techniques for coarse, finish, fine sanding and filling parquetry flooring

Types and uses of relevant tools and equipment used to conduct coarse, finish and fine sanding and filling operations

Workplace safety system requirements related to coarse, finish and fine sanding and filling parquetry flooring

Types of tools and equipment and procedures for their safe use, operation and maintenance

Characteristics of materials, products and defects

Set-up and operation of equipment

Products assembly techniques

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Fine sanding includes:

fine sanding existing parquetry floors either after a finish sand or where only minor rectification of scratches or wear and tear has occurred or between coats

Pre-sanding tasks include:

isolating and/or encapsulating the job site

nail punching

filling

scraping

sweeping

vacuuming

cleaning and removal of all foreign objects, such as nails, tacks and staples

Tools and equipment include:

hammer

scraper

nail punch

broom

vacuum

Materials include:

sanding belts

sanding paper

discs

oil and lubricants

cleaning materials

Sanding equipment includes:

split drum or belt sander

orbital or rotary finishing sanding machine

Edge sanding includes:

edge sanding machines both rotary and orbital using the full range of grit papers depending on the general floor sanding process

Finish sanding includes:

split drum and or belt floor sanding machines using 60–100 grit papers

Surface inspection includes:

ensuring that surface is free from dust and debris, moisture content is acceptable and stable, and any preservatives, protective coatings or other contaminants are adequately removed

Work sequence includes:

preparation

inspection

coating applications and intermediate steps

finalisation

acceptance inspection

Application methods include:

trowels

applicators

Filling materials include:

oil-based

water-based

plastic (one-pot) filler

Fine sanding equipment includes:

rotary and orbital floor sanding machines using 100–200 grit paper

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include:

workplace procedures relating to the use of tools and equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures