NTISthis.com

Evidence Guide: MSFFL3069 - Install rubber floor coverings

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3069 - Install rubber floor coverings

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for installation

  1. Identify and follow work health and safety, legislative and organisational requirements
  2. Read documentation and identify work requirements
  3. Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
  4. Select adhesives, trims and accessories based on job requirements
  5. Select and check tools, equipment and materials for suitability, serviceability and safety prior to use
  6. Plan sequence of work, including the starting point, to ensure efficiency and quality of installation
  7. Check rubber floor covering against order and acclimatise in accordance with manufacturer recommendations
Identify and follow work health and safety, legislative and organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Read documentation and identify work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select adhesives, trims and accessories based on job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check tools, equipment and materials for suitability, serviceability and safety prior to use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan sequence of work, including the starting point, to ensure efficiency and quality of installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check rubber floor covering against order and acclimatise in accordance with manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out materials

  1. Identify and follow instructions and sequence for laying and fixing
  2. Organise and use rubber floor coverings for fixing in accordance with safety management requirements
  3. Establish working lines and starting point.
Identify and follow instructions and sequence for laying and fixing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise and use rubber floor coverings for fixing in accordance with safety management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish working lines and starting point.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay resilient floor covering

  1. Lay out rubber floor coverings to meet directional sequence, pattern match, specification requirements, minimising waste and joins
  2. Accurately and clearly mark rubber flooring materials for cutting
  3. Cut rubber floor covering materials to required shape ensuring minimum waste
  4. Prepare adhesives and edge strips and/or accessories for use as required
  5. Use fixing methods and equipment in accordance with manufacturer recommendations
  6. Inspect finished job and rectify any imperfections in accordance with workplace procedures
Lay out rubber floor coverings to meet directional sequence, pattern match, specification requirements, minimising waste and joins

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accurately and clearly mark rubber flooring materials for cutting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut rubber floor covering materials to required shape ensuring minimum waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare adhesives and edge strips and/or accessories for use as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use fixing methods and equipment in accordance with manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect finished job and rectify any imperfections in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping

  1. Store and recycle unused materials in accordance with workplace procedures
  2. Check, clean and store tools and equipment in accordance with workplace procedures
  3. Clean work area and dispose of rubbish safely
  4. Accurately complete required workplace documentation
Store and recycle unused materials in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, clean and store tools and equipment in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean work area and dispose of rubbish safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accurately complete required workplace documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge