The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work
|
|
Identify and follow work health and safety, legislative and organisational requirements Completed |
Evidence:
|
Correctly identify work requirements and process from review of documentation Completed |
Evidence:
|
Confirm subfloor condition as suitable for installation consistent with Australian Standards and manufacturer recommendations Completed |
Evidence:
|
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition Completed |
Evidence:
|
Remove or undercut skirting boards or cover trims if required and store for re-fitting in accordance with work requirements Completed |
Evidence:
|
Plan sequence of work, including the position of each expansion joint, to ensure efficiency and quality of installation Completed |
Evidence:
|
Set out block parquetry flooring
|
|
Inspect timber flooring material and check against work orders, ensuring the species, grade, size and quantity are correct Completed |
Evidence:
|
Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures Completed |
Evidence:
|
Organise and use block parquetry flooring for fixing in accordance with safety management requirements Completed |
Evidence:
|
Prepare required adhesives and edge strips in accordance with manufacturer instructions Completed |
Evidence:
|
Accurately measure area to be covered, and establish working lines and starting point Completed |
Evidence:
|
Lay out and cut parquetry blocks
|
|
Follow instructions and sequence for laying and fixing Completed |
Evidence:
|
Lay appropriate underlay in accordance with manufacturer recommendations Completed |
Evidence:
|
Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins Completed |
Evidence:
|
Maximise the aesthetics of the materials, including matching grains and colours Completed |
Evidence:
|
Accurately and clearly mark parquetry blocks for cutting Completed |
Evidence:
|
Cut parquetry blocks, to provide appropriate size and shape ensuring minimum waste Completed |
Evidence:
|
Install block parquetry
|
|
Use required adhesives and edge strips/accessories in accordance with manufacturer instructions Completed |
Evidence:
|
Use fixing methods and equipment following manufacturer recommendations Completed |
Evidence:
|
Install and fix parquetry to produce required pattern Completed |
Evidence:
|
Allow for appropriate field and perimeter expansion joints Completed |
Evidence:
|
Fit and/or re-fit and finish skirting boards or cover trims Completed |
Evidence:
|
Inspect finished job and rectify any imperfections following workplace procedures Completed |
Evidence:
|
Complete housekeeping
|
|
Store and recycle unused materials in accordance with workplace procedures Completed |
Evidence:
|
Check, clean and store tools and equipment in accordance with workplace procedures Completed |
Evidence:
|
Clean work area and dispose of rubbish safely Completed |
Evidence:
|
Accurately complete required workplace documentation Completed |
Evidence:
|
Identify and follow work health and safety, legislative and organisational requirements Completed |
Evidence:
|
Correctly identify work requirements and process from review of documentation Completed |
Evidence:
|
Confirm subfloor condition as suitable for installation consistent with Australian Standards and manufacturer recommendations Completed |
Evidence:
|
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition Completed |
Evidence:
|
Remove or undercut skirting boards or cover trims if required and store for re-fitting in accordance with work requirements Completed |
Evidence:
|
Plan sequence of work, including the position of each expansion joint, to ensure efficiency and quality of installation Completed |
Evidence:
|