NTISthis.com

Evidence Guide: MSFFL3110 - Install adhesive-fixed carpet

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3110 - Install adhesive-fixed carpet

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install adhesive-fixed carpet

  1. Interpret underlay and carpet installation requirements from job and manufacturer instructions and calculate the quantities of materials required
  2. Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
  3. Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
  4. Gather underlay, carpet, adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to manufacturer instructions, product labels and safety data sheets
  5. Confirm the subfloor is clean and suitable for installing the carpet, and fix or report any deficiencies according to workplace procedures
  6. Apply primer to the subfloor according to the manufacturer instructions
Interpret underlay and carpet installation requirements from job and manufacturer instructions and calculate the quantities of materials required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gather underlay, carpet, adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to manufacturer instructions, product labels and safety data sheets

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm the subfloor is clean and suitable for installing the carpet, and fix or report any deficiencies according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply primer to the subfloor according to the manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay carpet using the direct-stick method

  1. Determine the set out and laying direction of the carpet according to job instructions to minimise waste and joins, consider the direction of the pile, and ensure an efficient, quality installation
  2. Establish the skirting point and seam placements for the carpet
  3. Lay out carpet pieces and measure, mark and check them for size, direction of the pile, pattern and match
  4. Fold back the carpet and apply adhesive to the subfloor according to the manufacturer instructions and workplace procedures
  5. Position, stretch and fasten the carpet into the adhesive, and seal and join the carpet pieces, according to the manufacturer instructions
  6. Trim off excess carpet, install finishing strips, and finish installing the carpet to meet quality requirements
  7. Check the carpet is installed correctly according to job instructions and quality requirements, and fix any deficiencies
Determine the set out and laying direction of the carpet according to job instructions to minimise waste and joins, consider the direction of the pile, and ensure an efficient, quality installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish the skirting point and seam placements for the carpet

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay out carpet pieces and measure, mark and check them for size, direction of the pile, pattern and match

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fold back the carpet and apply adhesive to the subfloor according to the manufacturer instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position, stretch and fasten the carpet into the adhesive, and seal and join the carpet pieces, according to the manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trim off excess carpet, install finishing strips, and finish installing the carpet to meet quality requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the carpet is installed correctly according to job instructions and quality requirements, and fix any deficiencies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay carpet using the dual-bond method

  1. Confirm the subfloor is clean and suitable for installing the carpet, and fix or report any deficiencies according to workplace procedures
  2. Apply primer to the subfloor according to the manufacturer instructions
  3. Establish the skirting point and seam placements for the underlay
  4. Lay out and trim the underlay according to job instructions
  5. Fold back the underlay and apply adhesive to the subfloor according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
  6. Position and fasten the underlay into the adhesive and trim the underlay according to the manufacturer instructions and job instructions
  7. Establish the skirting point and seam placements for the carpet
  8. Lay out the carpet pieces and measure, mark and check them for size, direction of the pile, pattern and match
  9. Fold back the carpet and apply adhesive to the underlay according to the manufacturer instructions and workplace procedures
  10. Position, stretch and fasten the carpet into the adhesive, and seal and join the carpet pieces, according to the manufacturer instructions
  11. Trim off excess carpet, install finishing strips and finish installing the carpet to meet quality requirements
  12. Check the carpet is installed correctly according to job instructions and quality requirements, and fix any deficiencies
Confirm the subfloor is clean and suitable for installing the carpet, and fix or report any deficiencies according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply primer to the subfloor according to the manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish the skirting point and seam placements for the underlay

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay out and trim the underlay according to job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fold back the underlay and apply adhesive to the subfloor according to the manufacturer instructions, product labels, safety data sheets and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position and fasten the underlay into the adhesive and trim the underlay according to the manufacturer instructions and job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish the skirting point and seam placements for the carpet

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay out the carpet pieces and measure, mark and check them for size, direction of the pile, pattern and match

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fold back the carpet and apply adhesive to the underlay according to the manufacturer instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position, stretch and fasten the carpet into the adhesive, and seal and join the carpet pieces, according to the manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trim off excess carpet, install finishing strips and finish installing the carpet to meet quality requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the carpet is installed correctly according to job instructions and quality requirements, and fix any deficiencies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the task according to workplace procedures

  1. Clean up the work area, identify items for recycling and dispose of waste
  2. Identify, tag and report any damage to equipment and tools
  3. Check, clean and do routine maintenance on equipment and tools and store them and unused materials
  4. Complete task outcome documentation
Clean up the work area, identify items for recycling and dispose of waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, tag and report any damage to equipment and tools

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, clean and do routine maintenance on equipment and tools and store them and unused materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete task outcome documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge