NTISthis.com

Evidence Guide: MSFFL3118 - Install sprung timber flooring

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFFL3118 - Install sprung timber flooring

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install sprung timber flooring

  1. Interpret sprung timber flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required
  2. Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating
  3. Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures
  4. Gather the flooring material and confirm its species, grade, size, quantity and quality against job instructions
  5. Check and confirm the flooring material’s moisture content is suitable for site conditions according to workplace procedures
  6. Gather the underlay, adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures
  7. Confirm the subfloor is clean and suitable for installing the flooring, and fix or report any deficiencies according to workplace procedures
  8. Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions
Interpret sprung timber flooring installation requirements from job and manufacturer instructions and calculate the quantities of materials required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify hazards relating to the work site, work practices, materials, tools and equipment, and check risk treatments are in place and operating

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check all required tools and equipment are ready to use, and organise to fix any deficiencies according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gather the flooring material and confirm its species, grade, size, quantity and quality against job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and confirm the flooring material’s moisture content is suitable for site conditions according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gather the underlay, adhesives, trims and other materials required by job instructions, and check they meet quality requirements and are prepared and ready to install according to the manufacturer instructions, product labels, safety data sheets and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm the subfloor is clean and suitable for installing the flooring, and fix or report any deficiencies according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove or undercut door jambs, cover trims and other joinery, and store for refitting or send for machining according to job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut, fit and fasten sprung timber flooring

  1. Install underfloor pads according to manufacturer instructions
  2. Install batten and/or sheet substrate materials according to job and manufacturer instructions
  3. Establish the starting point and mark out working lines
  4. Lay out the flooring according to job instructions to maximise aesthetics with respect to material colours, grains and patterns, to minimise waste and joins, and to ensure an efficient, quality installation
  5. Measure, mark and cut the flooring to length and size
  6. Install the flooring according to the manufacturer instructions, allowing appropriate field and perimeter expansion joints
  7. Refit removed items and finish installing the flooring
  8. Check the flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies
  9. Make any necessary preparations for sanding the flooring, according to job instructions
Install underfloor pads according to manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install batten and/or sheet substrate materials according to job and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish the starting point and mark out working lines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay out the flooring according to job instructions to maximise aesthetics with respect to material colours, grains and patterns, to minimise waste and joins, and to ensure an efficient, quality installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure, mark and cut the flooring to length and size

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install the flooring according to the manufacturer instructions, allowing appropriate field and perimeter expansion joints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Refit removed items and finish installing the flooring

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the flooring is installed correctly according to job instructions and quality requirements, and fix any deficiencies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make any necessary preparations for sanding the flooring, according to job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the task according to workplace procedures

  1. Clean up the work area, identify items for recycling and dispose of waste
  2. Identify, tag and report any damage to equipment and tools
  3. Check, clean and do routine maintenance on equipment and tools and store them and unused materials
  4. Complete task outcome documentation
Clean up the work area, identify items for recycling and dispose of waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, tag and report any damage to equipment and tools

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, clean and do routine maintenance on equipment and tools and store them and unused materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete task outcome documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge