The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare mould for casting
|
|
Check casting schedule, drawings and job specification Completed |
Evidence:
|
Check finish and veneer requirements for any or all faces, edges or surfaces Completed |
Evidence:
|
Prepare veneering equipment and formwork to temporarily support veneers and backing concrete Completed |
Evidence:
|
Prepare reinforcement
|
|
Check quantities, type, size and shape of reinforcement supplied against drawings and schedules Completed |
Evidence:
|
Place reinforcement and check concrete covers Completed |
Evidence:
|
Complete mould assembly Completed |
Evidence:
|
Insert lifting devices, lugs, fixing and other fittings according to drawings and specifications Completed |
Evidence:
|
Cast concrete
|
|
Pour concrete in correct sequence according to work schedule Completed |
Evidence:
|
Check adequate vibration Completed |
Evidence:
|
Complete casting process to plans and specification Completed |
Evidence:
|
Prepare test samples and/or cylinder as required by work instructions Completed |
Evidence:
|
Screed to a flat, accurate surface in preparation for finishing Completed |
Evidence:
|
Finish green concrete as required Completed |
Evidence:
|
Wet patch as required Completed |
Evidence:
|
Cure product
|
|
Cover and cure mould in accordance with standard procedure and any special requirements Completed |
Evidence:
|
Monitor curing to achieve specified stripping strength Completed |
Evidence:
|
Strip and store product
|
|
Safely remove mould parts at appropriate time, with care, and inspect for damage Completed |
Evidence:
|
Lift unit using appropriate lifting equipment and lifting methods Completed |
Evidence:
|
Arrange storage using protective pads to ensure against damage Completed |
Evidence:
|
Respond to problems
|
|
Identify routine and non-routine problems in the equipment or process Completed |
Evidence:
|
Rectify problems using appropriate solution within area of responsibility Completed |
Evidence:
|
Report problems outside area of responsibility to designated person Completed |
Evidence:
|
Control hazards
|
|
Identify architectural precast concrete production hazards Completed |
Evidence:
|
Assess the risks arising from those hazards Completed |
Evidence:
|
Implement measures to control those risks Completed |
Evidence:
|