The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSMPMC330 - Produce architectural precast concrete

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare mould for casting

  1. Check casting schedule, drawings and job specification
  2. Check finish and veneer requirements for any or all faces, edges or surfaces
  3. Prepare veneering equipment and formwork to temporarily support veneers and backing concrete
Check casting schedule, drawings and job specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check finish and veneer requirements for any or all faces, edges or surfaces

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare veneering equipment and formwork to temporarily support veneers and backing concrete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare reinforcement

  1. Check quantities, type, size and shape of reinforcement supplied against drawings and schedules
  2. Place reinforcement and check concrete covers
  3. Complete mould assembly
  4. Insert lifting devices, lugs, fixing and other fittings according to drawings and specifications
Check quantities, type, size and shape of reinforcement supplied against drawings and schedules

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place reinforcement and check concrete covers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete mould assembly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Insert lifting devices, lugs, fixing and other fittings according to drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cast concrete

  1. Pour concrete in correct sequence according to work schedule
  2. Check adequate vibration
  3. Complete casting process to plans and specification
  4. Prepare test samples and/or cylinder as required by work instructions
  5. Screed to a flat, accurate surface in preparation for finishing
  6. Finish green concrete as required
  7. Wet patch as required
Pour concrete in correct sequence according to work schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check adequate vibration

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete casting process to plans and specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare test samples and/or cylinder as required by work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Screed to a flat, accurate surface in preparation for finishing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish green concrete as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wet patch as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cure product

  1. Cover and cure mould in accordance with standard procedure and any special requirements
  2. Monitor curing to achieve specified stripping strength
Cover and cure mould in accordance with standard procedure and any special requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor curing to achieve specified stripping strength

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Strip and store product

  1. Safely remove mould parts at appropriate time, with care, and inspect for damage
  2. Lift unit using appropriate lifting equipment and lifting methods
  3. Arrange storage using protective pads to ensure against damage
Safely remove mould parts at appropriate time, with care, and inspect for damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lift unit using appropriate lifting equipment and lifting methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange storage using protective pads to ensure against damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Respond to problems

  1. Identify routine and non-routine problems in the equipment or process
  2. Rectify problems using appropriate solution within area of responsibility
  3. Report problems outside area of responsibility to designated person
Identify routine and non-routine problems in the equipment or process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify problems using appropriate solution within area of responsibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report problems outside area of responsibility to designated person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control hazards

  1. Identify architectural precast concrete production hazards
  2. Assess the risks arising from those hazards
  3. Implement measures to control those risks
Identify architectural precast concrete production hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess the risks arising from those hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement measures to control those risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge