The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Confirm soil sampling and testing requirements with supervisor
|
|
Review available site information, such as site plan, sampling/testing locations and history of sampling/testing. Completed |
Evidence:
|
Confirm the sampling locations, numbers and types of samples, timing and frequency of sampling from workplace or client’s sampling plan. Completed |
Evidence:
|
Check that all sampling/testing procedures are in accordance with client or workplace requirements, relevant standards and guidelines. Completed |
Evidence:
|
Prepare for soil sampling
|
|
Identify site and sampling hazards and review workplace safety procedures. Completed |
Evidence:
|
Liaise with relevant personnel to arrange site access and obtain all clearances and/or permits, as necessary. Completed |
Evidence:
|
Select sampling equipment and conditions to achieve representative samples and to preserve sample integrity during collection, storage and transit. Completed |
Evidence:
|
Select field test equipment/instruments and check operation and calibration, as required, in accordance with procedures and manufacturer instructions. Completed |
Evidence:
|
Assemble and check all sampling equipment, field test equipment, materials, containers and safety equipment. Completed |
Evidence:
|
Arrange suitable transport to, from and around site, as required. Completed |
Evidence:
|
Conduct sampling and log soil samples
|
|
Locate sampling points and any services at the site. Completed |
Evidence:
|
Work effectively with other site personnel during drilling and excavation operations to collect and log reliable samples, as necessary. Completed |
Evidence:
|
Conduct representative sampling in accordance with sampling plan and defined procedures for field and/or laboratory testing, as required. Completed |
Evidence:
|
Record all information and label samples in accordance with traceability requirements. Completed |
Evidence:
|
Record environment and any conditions or atypical observations made during sampling that may impact on sample representativeness or integrity. Completed |
Evidence:
|
Transport all samples back to base according to workplace procedures and relevant codes. Completed |
Evidence:
|
Prepare soil samples for testing
|
|
Prepare sub-samples and back-up sub-samples that are representative of the source. Completed |
Evidence:
|
Label all sub-samples to ensure traceability and store in accordance with workplace procedures. Completed |
Evidence:
|
Follow defined preparation and safety procedures to limit hazards or contamination to samples, self, work area and environment. Completed |
Evidence:
|
Distribute sub-samples to required destinations for testing, maintaining sample integrity, traceability and chain of custody requirements. Completed |
Evidence:
|
Conduct physical and chemical soil tests in the field
|
|
Obtain sample or sub-sample for designated field test. Completed |
Evidence:
|
Check that all equipment, instruments and reagents are fit for purpose. Completed |
Evidence:
|
Set up and calibrate instruments, as necessary, to ensure safe operation and valid results. Completed |
Evidence:
|
Operate equipment/instruments in accordance with test method requirements. Completed |
Evidence:
|
Perform tests/procedures/observations on all samples and standards, if appropriate, in accordance with specified methods Completed |
Evidence:
|
Record all field observations and results and ensure that they are accurately transferred to workplace information management system. Completed |
Evidence:
|
Conduct physical and chemical soil tests in the laboratory
|
|
Obtain sample or sub-sample for designated laboratory test. Completed |
Evidence:
|
Check that all equipment, instruments and reagents are fit for purpose. Completed |
Evidence:
|
Set up and calibrate instruments, as necessary, to ensure safe operation and valid results. Completed |
Evidence:
|
Operate equipment/instruments in accordance with test method requirements. Completed |
Evidence:
|
Perform tests/procedures on all samples, blanks and standards, if appropriate, in accordance with specified methods.. Completed |
Evidence:
|
Record test data noting atypical observations Completed |
Evidence:
|
Process the data for samples, standards and blanks in accordance with workplace procedures. Completed |
Evidence:
|
Enter approved information into workplace information management system. Completed |
Evidence:
|
Review results and assess soil suitability for specific purposes
|
|
Review results in relation to legislative and/or client requirements. Completed |
Evidence:
|
Compare data with required/established/desired parameters to establish suitability for purpose. Completed |
Evidence:
|
Determine need for remedial action and report to client. Completed |
Evidence:
|
Maintain a safe work environment
|
|
Rehabilitate sampling site to render it safe and to minimise environmental impact. Completed |
Evidence:
|
Clean all equipment, containers, work area and vehicles according to workplace procedures. Completed |
Evidence:
|
Check serviceability of all equipment before storage. Completed |
Evidence:
|
Use defined safe work practices and personal protective equipment (PPE) to ensure personal safety and that of others. Completed |
Evidence:
|
Minimise the generation of wastes and environment impacts. Completed |
Evidence:
|
Ensure the safe collection of all hazardous wastes for appropriate disposal. Completed |
Evidence:
|