Evidence Guide: NWPNET031 - Construct and install water distribution assets

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

NWPNET031 - Construct and install water distribution assets

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for construction and installation

  1. Determine work requirements for construction and installation of water distribution system pipes and assets from plans, specifications and instructions.
  2. Perform site checks to prevent damage to other utilities.
  3. Select and check equipment and tools to meet safety and work requirements of task and site.
  4. Select, fit and use personal protective equipment.
Determine work requirements for construction and installation of water distribution system pipes and assets from plans, specifications and instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform site checks to prevent damage to other utilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check equipment and tools to meet safety and work requirements of task and site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, fit and use personal protective equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and install distribution assets, pipes and associated fittings

  1. Excavate and prepare trenches.
  2. Lay bedding or foundation.
  3. Inspect pipes and fittings, and lay or join them.
  4. Install or place prefabricated components.
  5. Backfill excavations according to specifications.
Excavate and prepare trenches.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay bedding or foundation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect pipes and fittings, and lay or join them.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install or place prefabricated components.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill excavations according to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm work quality

  1. Check constructed and installed distribution assets, pipes and fittings to ensure that specifications are met.
  2. Check water quality testing results to ensure that organisational requirements are met.
Check constructed and installed distribution assets, pipes and fittings to ensure that specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check water quality testing results to ensure that organisational requirements are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

  1. Check, maintain and store equipment, tools and materials.
  2. Restore work site.
  3. Complete workplace records and as constructed drawings, and process as required.
Check, maintain and store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete workplace records and as constructed drawings, and process as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for construction and installation

  1. Determine work requirements for construction and installation of water distribution system pipes and assets from plans, specifications and instructions.
  2. Perform site checks to prevent damage to other utilities.
  3. Select and check equipment and tools to meet safety and work requirements of task and site.
  4. Select, fit and use personal protective equipment.
Determine work requirements for construction and installation of water distribution system pipes and assets from plans, specifications and instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform site checks to prevent damage to other utilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check equipment and tools to meet safety and work requirements of task and site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, fit and use personal protective equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and install distribution assets, pipes and associated fittings

  1. Excavate and prepare trenches.
  2. Lay bedding or foundation.
  3. Inspect pipes and fittings, and lay or join them.
  4. Install or place prefabricated components.
  5. Backfill excavations according to specifications.
Excavate and prepare trenches.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay bedding or foundation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect pipes and fittings, and lay or join them.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install or place prefabricated components.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill excavations according to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm work quality

  1. Check constructed and installed distribution assets, pipes and fittings to ensure that specifications are met.
  2. Check water quality testing results to ensure that organisational requirements are met.
Check constructed and installed distribution assets, pipes and fittings to ensure that specifications are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check water quality testing results to ensure that organisational requirements are met.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

  1. Check, maintain and store equipment, tools and materials.
  2. Restore work site.
  3. Complete workplace records and as constructed drawings, and process as required.
Check, maintain and store equipment, tools and materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete workplace records and as constructed drawings, and process as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare for construction and installation

1.1 Determine work requirements for construction and installation of water distribution system pipes and assets from plans, specifications and instructions.

1.2 Perform site checks to prevent damage to other utilities.

1.3 Select and check equipment and tools to meet safety and work requirements of task and site.

1.4 Select, fit and use personal protective equipment.

2. Construct and install distribution assets, pipes and associated fittings

2.1 Excavate and prepare trenches.

2.2 Lay bedding or foundation.

2.3 Inspect pipes and fittings, and lay or join them.

2.4 Install or place prefabricated components.

2.5 Backfill excavations according to specifications.

3. Confirm work quality

3.1 Check constructed and installed distribution assets, pipes and fittings to ensure that specifications are met.

3.2 Check water quality testing results to ensure that organisational requirements are met.

4. Finalise work

4.1 Check, maintain and store equipment, tools and materials.

4.2 Restore work site.

4.3 Complete workplace records and as constructed drawings, and process as required.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Plan and prepare for construction and installation

1.1 Determine work requirements for construction and installation of water distribution system pipes and assets from plans, specifications and instructions.

1.2 Perform site checks to prevent damage to other utilities.

1.3 Select and check equipment and tools to meet safety and work requirements of task and site.

1.4 Select, fit and use personal protective equipment.

2. Construct and install distribution assets, pipes and associated fittings

2.1 Excavate and prepare trenches.

2.2 Lay bedding or foundation.

2.3 Inspect pipes and fittings, and lay or join them.

2.4 Install or place prefabricated components.

2.5 Backfill excavations according to specifications.

3. Confirm work quality

3.1 Check constructed and installed distribution assets, pipes and fittings to ensure that specifications are met.

3.2 Check water quality testing results to ensure that organisational requirements are met.

4. Finalise work

4.1 Check, maintain and store equipment, tools and materials.

4.2 Restore work site.

4.3 Complete workplace records and as constructed drawings, and process as required.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

laying and joining pipes

installing associated fittings and components

identifying and responding to operational problems

interpreting plans, instructions and standard operating procedures

performing work-related calculations

using tools and machinery

identifying hazards

constructing and installing water distribution system assets

planning work and preparing work site safely

checking quality of work and ensuring water quality standards

clearing the work site

completing documentation

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

risk factors and potential hazards of construction and installation processes

electrical safety for disconnection and changing meters and fittings

equipment operation, capacity and limitations

effects of weather and conditions on operation of site or plant

environmental aspects of construction and installation

component parts

shoring and levelling

conditions for connection to live water mains

Cathodic Protection, Denso wrap, Stopaq