The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan own work requirements.
|
|
Identify equipment and processes to be used for production process and upstream and downstream operations from production plan or request. Completed |
Evidence:
|
Identify and check materials required including additives. Completed |
Evidence:
|
Implement measures to control identified hazards in line with procedures and duty of care. Completed |
Evidence:
|
Identify and check emergency stops, guards and controls. Completed |
Evidence:
|
Identify requirements for materials, quality, production and equipment checks. Completed |
Evidence:
|
Identify materials, waste management and housekeeping needs. Completed |
Evidence:
|
Set up equipment, mould and materials to procedures.
|
|
Determine equipment requirements. Completed |
Evidence:
|
Adjust controls as required for factors such as ambient conditions, temperature and materials. Completed |
Evidence:
|
Check equipment, raw material and mould all match job requirements. Completed |
Evidence:
|
Check materials, resins, fibres, release agents are correct. Completed |
Evidence:
|
Take appropriate action for non-conforming materials. Completed |
Evidence:
|
Set up date, batch and materials markings to specifications, as required. Completed |
Evidence:
|
Complete pre-start checks. Completed |
Evidence:
|
Hand operate chopper gun/depositor.
|
|
Use chopper gun/depositor to apply materials to the mould to procedures. Completed |
Evidence:
|
Monitor product quality, thickness, colour and integrity. Completed |
Evidence:
|
Make adjustments to remedy faults and non-conformances as required. Completed |
Evidence:
|
Collect and segregate scrap, trim and other materials as required. Completed |
Evidence:
|
Shut off machine safely and correctly as required following procedures. Completed |
Evidence:
|
Anticipate and solve problems.
|
|
Recognise a problem or a potential problem.. Completed |
Evidence:
|
Determine problems needing priority action. Completed |
Evidence:
|
Refer problems outside area of responsibility to appropriate person, with possible causes. Completed |
Evidence:
|
Solve problems within area of responsibility. Completed |
Evidence:
|
Seek information and assistance as required to solve problems Completed |
Evidence:
|
Follow through items initiated until final resolution has occurred. Completed |
Evidence:
|