Evidence Guide: RIICBS304A - Compact asphalt with rollers

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICBS304A - Compact asphalt with rollers

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply compliance documentation relevant to the work activity
  2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
  3. Identify, obtain and implement signage requirements from the project traffic management plan
  4. Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
  5. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
Access, interpret and apply compliance documentation relevant to the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement signage requirements from the project traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare roller

  1. Perform pre-operational checks as per manufacturer's or company instructions
  2. Record job specifications
  3. Produce work schedule
  4. Plan water usage and replenishment
  5. Set tyres to required pressure (self propelled, multi-wheeled pneumatic tyred rollers)
Perform pre-operational checks as per manufacturer's or company instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce work schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan water usage and replenishment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set tyres to required pressure (self propelled, multi-wheeled pneumatic tyred rollers)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact asphalt

  1. Identify site hazards associated with compacting asphalt with rollers and use safe operating techniques to minimise risk
  2. Determine speed and rolling patterns according to job requirements
  3. Set amplitude and frequency as directed for vibratory steel wheeled rollers
  4. Avoid damage to other structures
  5. Monitor watering system to prevent pick up
  6. Maintain uniform speed and rolling pattern to job specification
  7. Compact joints to job specifications
  8. Compact final surface free of blemishes or rolling marks
  9. Maintain safe distance between rollers, other plant and the paving crew
Identify site hazards associated with compacting asphalt with rollers and use safe operating techniques to minimise risk

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine speed and rolling patterns according to job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set amplitude and frequency as directed for vibratory steel wheeled rollers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Avoid damage to other structures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor watering system to prevent pick up

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain uniform speed and rolling pattern to job specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact joints to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compact final surface free of blemishes or rolling marks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain safe distance between rollers, other plant and the paving crew

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out roller operator maintenance

  1. Park Roller safely, shutdown and prepare for maintenance as per manufacturer's manual and/or organisational requirements
  2. Conduct inspection and fault finding
  3. Remove and replace defective parts safely and effectively
  4. Carry out regular programmed maintenance tasks
Park Roller safely, shutdown and prepare for maintenance as per manufacturer's manual and/or organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove and replace defective parts safely and effectively

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out regular programmed maintenance tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relocate roller

  1. Prepare roller for relocation
  2. Drive roller safely on highways and construction sites, observing highway code and local safety requirements
Prepare roller for relocation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive roller safely on highways and construction sites, observing highway code and local safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials in accordance with project environmental management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for compacting asphalt with rollers

implementation of requirements, procedures and techniques for the safe, effective and efficient compacting of asphalt with rollers

working with others to undertake and complete the compacting of asphalt with rollers that meets all of the required outcomes

consistent timely compacting of asphalt with rollers that safely, effectively and efficiently meets the required outcomes

a minimum of 2000m2 of asphalt is to be compacted to the determined pattern, the measured density, with the minimum number of passes specified and to job specifications for five projects, with at least one project under 50mm thick and one project over 50mm thick

a minimum of three longitudinal joints of 100 metres each and two transfer joints to be matched

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete the compacting of asphalt with rollers

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Required Skills and Knowledge

Required skills

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to compact asphalt with rollers:

apply legislative, organisation and site requirements and procedures for compacting of asphalt with rollers

organise work activities

select and use relevant tools and equipment safely

identify and report on hazards related to the worksite and work activity

communicate effectively to receive and clarify work instructions

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to compact asphalt with rollers:

site and equipment safety requirements

asphalt compacting techniques

asphalt paving operations

asphalt strength and performance characteristics

edge and joint treatments

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

processes for the calculation of material uniformity and travel speed

materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

safe operating techniques in all terrain

JSAs/safe work method statements

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Safety requirements may include:

OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances

safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement

safe operating procedures including recognising and preventing hazards associated with uneven/unstable terrain, trees, pits, poles, trip hazards, dirt mounds, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working in proximity to others, worksite visitors and the public

recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials

emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation

Site may include:

car parks

airport runways

container yards

hard stands

footpaths

bikeways

roadways

Signage may include:

escort vehicle

highway traffic signs

site safety signage

temporary signage for the benefit of motorists and pedestrians

traffic conditions signage

Traffic conditions may include:

congested urban environments

low traffic rural areas

off-road un-trafficked areas

buildings

parking sites

pedestrian areas

Tools and equipment may include:

rollers

roller mats

spare water jets

water transfer equipment

shovels

brooms

rakes

basic tool kit

Environmental protection requirements may include:

organisational/project environmental management plan

waste management

water quality protection

noise

vibration

dust and clean-up management

Rollers may include:

steel double drum static roller

double drum vibratory roller

self propelled multi wheel pneumatic tyred roller

combination roller

roller operation is to include filling the roller with water

Other structures may include:

kerb and channel

buildings

Materials may include:

water

wetting agents