The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task Completed |
Evidence:
|
Identify, obtain and implement signage requirements from the project traffic management plan Completed |
Evidence:
|
Select plant, tools and equipment to carry out concreting work consistent with the requirements of the job, check for serviceability and rectify or report any faults Completed |
Evidence:
|
Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task Completed |
Evidence:
|
Select materials
|
|
Determine location of steel reinforcement and formwork from drawings and reinforcement schedule Completed |
Evidence:
|
Check reinforcement against drawings and specifications Completed |
Evidence:
|
Select formwork components/materials consistent with job Completed |
Evidence:
|
Select and use fixing/fasteners Completed |
Evidence:
|
Set out for concrete work
|
|
Set string lines accurately from existing pegs Completed |
Evidence:
|
Check grades to ensure correct fall Completed |
Evidence:
|
Identify and protect services to prevent damage Completed |
Evidence:
|
Construct and fit reinforcement
|
|
Cut and bend reinforcing fabric and bars as required by project drawings and specifications Completed |
Evidence:
|
Tie/fix fabric and bars to configuration Completed |
Evidence:
|
Attach stiffening rods to panels as required to facilitate handling Completed |
Evidence:
|
Locate reinforcement material in formwork, and place it on bar chairs/spacers as determined from drawings, noting clearance from formwork Completed |
Evidence:
|
Locate and secure cast-ins Completed |
Evidence:
|
Erect formwork
|
|
Clear work area and prepare surface for safe erection of formwork Completed |
Evidence:
|
Set out formwork to requirements of drawings and specifications Completed |
Evidence:
|
Assemble/erect and brace formwork Completed |
Evidence:
|
Position expansion joints to specification and to relevant Australian standard Completed |
Evidence:
|
Position dowel joints Completed |
Evidence:
|
Remove debris, sawdust and other waste material from formwork Completed |
Evidence:
|
Apply release agent to manufacturer's specifications Completed |
Evidence:
|
Carry out concrete work
|
|
Place concrete correctly to specified levels and grades and to avoid segregation Completed |
Evidence:
|
Compact concrete using immersion vibrator or other specified method Completed |
Evidence:
|
Screed, finish and apply curing process to concrete Completed |
Evidence:
|
Cover and protect concrete surface adequately Completed |
Evidence:
|
Strip formwork
|
|
Remove edge boxing and braces sequentially Completed |
Evidence:
|
Denail, clean, store or stack timber components Completed |
Evidence:
|
Clean, oil, store or stack steel components Completed |
Evidence:
|
Discard damaged formwork components after stripping Completed |
Evidence:
|
Clean screens safely before movement, where applicable Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials in accordance with project environmental management plan Completed |
Evidence:
|
Clean, check, maintain and store tools and equipment t Completed |
Evidence:
|