The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for installing stormwater systems
|
|
Access, interpret and apply stormwater systems documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, interpret, clarify and confirm work/plans/specifications requirements Completed |
Evidence:
|
Identify, obtain and implement traffic signage requirements Completed |
Evidence:
|
Select, and check for faults, equipment/tools for work activities Completed |
Evidence:
|
Identify, confirm and apply environmental protection requirements Completed |
Evidence:
|
Select and wear personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify, address and report potential hazards and risks Completed |
Evidence:
|
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency Completed |
Evidence:
|
Set out and excavate
|
|
Prepare work area and materials Completed |
Evidence:
|
Determine and apply dewatering requirements Completed |
Evidence:
|
Determine location, alignment direction, level and grade of stormwater system Completed |
Evidence:
|
Set out works to specification Completed |
Evidence:
|
Advise plant operator of excavation requirements and monitor levels Completed |
Evidence:
|
Install stormwater system bedding Completed |
Evidence:
|
Install stormwater system
|
|
Lower pipes and place in position Completed |
Evidence:
|
Join pipes correctly Completed |
Evidence:
|
Continuously check alignment level and grade continuously for conformance Completed |
Evidence:
|
Position side support and/or overlay beside the pipes Completed |
Evidence:
|
Fit inspection openings Completed |
Evidence:
|
Monitor backfill procedure and ensure work is completed to requirements Completed |
Evidence:
|
Test stormwater system
|
|
Perform stormwater system test procedures establishing functionality and serviceability Completed |
Evidence:
|
Record and report test results Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Plan and prepare for installing stormwater systems
|
|
Access, interpret and apply stormwater systems documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, interpret, clarify and confirm work/plans/specifications requirements Completed |
Evidence:
|
Identify, obtain and implement traffic signage requirements Completed |
Evidence:
|
Select, and check for faults, equipment/tools for work activities Completed |
Evidence:
|
Identify, confirm and apply environmental protection requirements Completed |
Evidence:
|
Select and wear personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify, address and report potential hazards and risks Completed |
Evidence:
|
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency Completed |
Evidence:
|
Set out and excavate
|
|
Prepare work area and materials Completed |
Evidence:
|
Determine and apply dewatering requirements Completed |
Evidence:
|
Determine location, alignment direction, level and grade of stormwater system Completed |
Evidence:
|
Set out works to specification Completed |
Evidence:
|
Advise plant operator of excavation requirements and monitor levels Completed |
Evidence:
|
Install stormwater system bedding Completed |
Evidence:
|
Install stormwater system
|
|
Lower pipes and place in position Completed |
Evidence:
|
Join pipes correctly Completed |
Evidence:
|
Continuously check alignment level and grade continuously for conformance Completed |
Evidence:
|
Position side support and/or overlay beside the pipes Completed |
Evidence:
|
Fit inspection openings Completed |
Evidence:
|
Monitor backfill procedure and ensure work is completed to requirements Completed |
Evidence:
|
Test stormwater system
|
|
Perform stormwater system test procedures establishing functionality and serviceability Completed |
Evidence:
|
Record and report test results Completed |
Evidence:
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|