Evidence Guide: RIICRC205D - Install utility poles

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICRC205D - Install utility poles

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to install utility poles

  1. Access, interpret and apply utility pole installation documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, obtain, confirm and implement signage requirements
  6. Select and check for faults all plant, tools and equipment to carry out tasks
Access, interpret and apply utility pole installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults all plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect utility poles

  1. Set out job to alignment and locations according to job drawings
  2. Excavate holes for utility poles and/or bases
  3. Install concrete base and holding down bolts
  4. Erect poles and attach them plumb to cast in base to alignment
  5. Stabilise and/or backfill poles to specifications
Set out job to alignment and locations according to job drawings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate holes for utility poles and/or bases

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install concrete base and holding down bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect poles and attach them plumb to cast in base to alignment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stabilise and/or backfill poles to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and recycle or dispose of materials
  2. Store or stack unused materials
  3. Clean, check, maintain and store plant, tools and equipment
Clear work area and recycle or dispose of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store or stack unused materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to install utility poles

  1. Access, interpret and apply utility pole installation documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, obtain, confirm and implement signage requirements
  6. Select and check for faults all plant, tools and equipment to carry out tasks
Access, interpret and apply utility pole installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults all plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect utility poles

  1. Set out job to alignment and locations according to job drawings
  2. Excavate holes for utility poles and/or bases
  3. Install concrete base and holding down bolts
  4. Erect poles and attach them plumb to cast in base to alignment
  5. Stabilise and/or backfill poles to specifications
  6. Clear work area and recycle or dispose of materials
  7. Store or stack unused materials
  8. Clean, check, maintain and store plant, tools and equipment
Set out job to alignment and locations according to job drawings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate holes for utility poles and/or bases

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install concrete base and holding down bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect poles and attach them plumb to cast in base to alignment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stabilise and/or backfill poles to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and recycle or dispose of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store or stack unused materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to install utility poles

1.1 Access, interpret and apply utility pole installation documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

2. Erect utility poles

2.1 Set out job to alignment and locations according to job drawings

2.2 Excavate holes for utility poles and/or bases

2.3 Install concrete base and holding down bolts

2.4 Erect poles and attach them plumb to cast in base to alignment

2.5 Stabilise and/or backfill poles to specifications

3. Clean up

3.1 Clear work area and recycle or dispose of materials

3.2 Store or stack unused materials

3.3 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to install utility poles

1.1 Access, interpret and apply utility pole installation documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

2. Erect utility poles

2.1 Set out job to alignment and locations according to job drawings

2.2 Excavate holes for utility poles and/or bases

2.3 Install concrete base and holding down bolts

2.4 Erect poles and attach them plumb to cast in base to alignment

2.5 Stabilise and/or backfill poles to specifications

3. Clean up

3.1 Clear work area and recycle or dispose of materials

3.2 Store or stack unused materials

3.3 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

competently completes all evidence activities with the ability to transfer and apply skills and knowledge to new situations and environments on more than one occasion

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient installation of utility poles including:

identifying and applying relevant job drawings and specifications to all work activities

confirming safety requirements

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing requirements for signage

selecting and checking for faults, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues and ground conditions

works effectively with others to undertake and complete the installation of utility poles in a way that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of installing utility poles that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

erecting utility poles in keeping with drawings and specifications

conducting a clean-up of the work area and disposing of waste

as an individual or as a member of a two-three (2-3) person team, undertake and complete the installation of two utility poles to specification

The candidate must demonstrate knowledge in installing utility poles through:

accessing, interpreting and applying, organisation and site requirements and procedures for:

identifying and managing risks

identifying, addressing and reporting environmental issues and ground conditions

setting up work activity

site isolation and traffic control responsibilities

work health and safety

managing waste

selecting and checking for faults, tools and equipment to carry out tasks

carrying out work to drawings and specifications

applying effective installation techniques