The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare to maintain drainage systems
|
|
Access, interpret and apply drainage systems maintenance documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear correct personal protective equipment appropriate for work activities Completed |
Evidence:
|
Locate initial design specifications and/or engineer’s redesign Completed |
Evidence:
|
Locate drainage maintenance schedule and records of maintenance history Completed |
Evidence:
|
Determine temporary stormwater diversion requirement in accordance with existing drainage outlets, site requirements and planned schedule of construction Completed |
Evidence:
|
Maintain drainage components
|
|
Regularly inspect and maintain drainage components and rectify or report faults Completed |
Evidence:
|
Repair drainage components as per initial design specifications and/or engineer’s redesign Completed |
Evidence:
|
Flush out drainage system to clear blockages and provide clear flows of fluid Completed |
Evidence:
|
Excavate and repair drainage systems
|
|
Determine location of repairs from work order and survey site Completed |
Evidence:
|
Carry out excavation in accordance with task specifications Completed |
Evidence:
|
Prepare pipes and accessories in accordance with design method of repair Completed |
Evidence:
|
Replace pipe sections and join and align to line and specified fall Completed |
Evidence:
|
Install packing to maintain alignment of pipeline Completed |
Evidence:
|
Make joints to pipe section junctions in accordance with specification requirements Completed |
Evidence:
|
Backfill required section Completed |
Evidence:
|
Conduct inspection and testing of repaired drainage system to determine effectiveness of repairs Completed |
Evidence:
|
Maintain open drains
|
|
Maintain open drains to correct line and fall specifications Completed |
Evidence:
|
Finish surfaces adjoining open drains allowing ease of run off Completed |
Evidence:
|
Undertake adequate erosion control methods Completed |
Evidence:
|
Inspect, clear and repair culverts
|
|
Identify faults in culverts and determine appropriate repair requirements and specifications Completed |
Evidence:
|
Repair/replace sections and joint to levels and design specifications Completed |
Evidence:
|
Repair/maintain inlets and outlets in accordance with culvert design and specifications Completed |
Evidence:
|
Compact backfill Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Seal and store/pack unused materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Plan and prepare to maintain drainage systems
|
|
Access, interpret and apply drainage systems maintenance documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear correct personal protective equipment appropriate for work activities Completed |
Evidence:
|
Locate initial design specifications and/or engineer’s redesign Completed |
Evidence:
|
Locate drainage maintenance schedule and records of maintenance history Completed |
Evidence:
|
Determine temporary stormwater diversion requirement in accordance with existing drainage outlets, site requirements and planned schedule of construction Completed |
Evidence:
|
Maintain drainage components
|
|
Regularly inspect and maintain drainage components and rectify or report faults Completed |
Evidence:
|
Repair drainage components as per initial design specifications and/or engineer’s redesign Completed |
Evidence:
|
Flush out drainage system to clear blockages and provide clear flows of fluid Completed |
Evidence:
|
Excavate and repair drainage systems
|
|
Determine location of repairs from work order and survey site Completed |
Evidence:
|
Carry out excavation in accordance with task specifications Completed |
Evidence:
|
Prepare pipes and accessories in accordance with design method of repair Completed |
Evidence:
|
Replace pipe sections and join and align to line and specified fall Completed |
Evidence:
|
Install packing to maintain alignment of pipeline Completed |
Evidence:
|
Make joints to pipe section junctions in accordance with specification requirements Completed |
Evidence:
|
Backfill required section Completed |
Evidence:
|
Conduct inspection and testing of repaired drainage system to determine effectiveness of repairs Completed |
Evidence:
|
Maintain open drains
|
|
Maintain open drains to correct line and fall specifications Completed |
Evidence:
|
Finish surfaces adjoining open drains allowing ease of run off Completed |
Evidence:
|
Undertake adequate erosion control methods Completed |
Evidence:
|
Inspect, clear and repair culverts
|
|
Identify faults in culverts and determine appropriate repair requirements and specifications Completed |
Evidence:
|
Repair/replace sections and joint to levels and design specifications Completed |
Evidence:
|
Repair/maintain inlets and outlets in accordance with culvert design and specifications Completed |
Evidence:
|
Compact backfill Completed |
Evidence:
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Seal and store/pack unused materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|