Evidence Guide: RIICTB309D - Construct, maintain and remove coffer dams

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICTB309D - Construct, maintain and remove coffer dams

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to construct and remove coffer dams

  1. Access, interpret and apply coffer dams documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify, address and report hazards, risks and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Confirm and apply environmental protection and safety requirements
  6. Obtain, interpret and implement traffic management signage requirements
  7. Select and check for faults plant, tools and equipment to carry out tasks
  8. Identify, confirm, safely handle and locate, ready for use, materials required for the work application
  9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply coffer dams documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm, safely handle and locate, ready for use, materials required for the work application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and maintain dam

  1. Contact utilities to check placement of marine cables before coffer dam construction
  2. Drive sheet piles into location
  3. Brace sheet piles
  4. Dewater and caulk dammed area
  5. Install sump and/or pump to remove excess water seepage
  6. Remove mud manually from dammed area
  7. Level dammed area ready for bridge work to commence
Contact utilities to check placement of marine cables before coffer dam construction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive sheet piles into location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Brace sheet piles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dewater and caulk dammed area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install sump and/or pump to remove excess water seepage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove mud manually from dammed area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Level dammed area ready for bridge work to commence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove coffer dam

  1. Clear dammed area of any refuse or construction waste
  2. Remove temporary concrete slab, where used
  3. Flood coffer dam
  4. Remove sheet pile
  5. Extract and dismantle sheet piling allowing waterway to restore its original flow
Clear dammed area of any refuse or construction waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove temporary concrete slab, where used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Flood coffer dam

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove sheet pile

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Extract and dismantle sheet piling allowing waterway to restore its original flow

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store machinery, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store machinery, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to construct and remove coffer dams

  1. Access, interpret and apply coffer dams documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify, address and report hazards, risks and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Confirm and apply environmental protection and safety requirements
  6. Obtain, interpret and implement traffic management signage requirements
  7. Select and check for faults plant, tools and equipment to carry out tasks
  8. Identify, confirm, safely handle and locate, ready for use, materials required for the work application
  9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply coffer dams documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm, safely handle and locate, ready for use, materials required for the work application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and maintain dam

  1. Contact utilities to check placement of marine cables before coffer dam construction
  2. Drive sheet piles into location
  3. Brace sheet piles
  4. Dewater and caulk dammed area
  5. Install sump and/or pump to remove excess water seepage
  6. Remove mud manually from dammed area
  7. Level dammed area ready for bridge work to commence
Contact utilities to check placement of marine cables before coffer dam construction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive sheet piles into location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Brace sheet piles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dewater and caulk dammed area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install sump and/or pump to remove excess water seepage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove mud manually from dammed area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Level dammed area ready for bridge work to commence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove coffer dam

  1. Clear dammed area of any refuse or construction waste
  2. Remove temporary concrete slab, where used
  3. Flood coffer dam
  4. Remove sheet pile
  5. Extract and dismantle sheet piling allowing waterway to restore its original flow
  6. Clear work area and dispose of or recycle materials
  7. Clean, check, maintain and store machinery, tools and equipment
Clear dammed area of any refuse or construction waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove temporary concrete slab, where used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Flood coffer dam

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove sheet pile

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Extract and dismantle sheet piling allowing waterway to restore its original flow

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store machinery, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to construct and remove coffer dams

1.1 Access, interpret and apply coffer dams documentation and ensure the work activity is compliant

1.2. Obtain, read, interpret, clarify and confirm work requirements

1.3. Identify, address and report hazards, risks and environmental issues and implement control measures

1.4. Select and wear personal protective equipment appropriate for work activities

1.5. Confirm and apply environmental protection and safety requirements

1.6. Obtain, interpret and implement traffic management signage requirements

1.7. Select and check for faults plant, tools and equipment to carry out tasks

1.8. Identify, confirm, safely handle and locate, ready for use, materials required for the work application

1.9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Construct and maintain dam

2.1. Contact utilities to check placement of marine cables before coffer dam construction

2.2. Drive sheet piles into location

2.3. Brace sheet piles

2.4. Dewater and caulk dammed area

2.5. Install sump and/or pump to remove excess water seepage

2.6. Remove mud manually from dammed area

2.7. Level dammed area ready for bridge work to commence

3. Remove coffer dam

3.1. Clear dammed area of any refuse or construction waste

3.2. Remove temporary concrete slab, where used

3.3. Flood coffer dam

3.4. Remove sheet pile

3.5. Extract and dismantle sheet piling allowing waterway to restore its original flow

4. Clean up

4.1. Clear work area and dispose of or recycle materials

4.2. Clean, check, maintain and store machinery, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to construct and remove coffer dams

1.1 Access, interpret and apply coffer dams documentation and ensure the work activity is compliant

1.2. Obtain, read, interpret, clarify and confirm work requirements

1.3. Identify, address and report hazards, risks and environmental issues and implement control measures

1.4. Select and wear personal protective equipment appropriate for work activities

1.5. Confirm and apply environmental protection and safety requirements

1.6. Obtain, interpret and implement traffic management signage requirements

1.7. Select and check for faults plant, tools and equipment to carry out tasks

1.8. Identify, confirm, safely handle and locate, ready for use, materials required for the work application

1.9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Construct and maintain dam

2.1. Contact utilities to check placement of marine cables before coffer dam construction

2.2. Drive sheet piles into location

2.3. Brace sheet piles

2.4. Dewater and caulk dammed area

2.5. Install sump and/or pump to remove excess water seepage

2.6. Remove mud manually from dammed area

2.7. Level dammed area ready for bridge work to commence

3. Remove coffer dam

3.1. Clear dammed area of any refuse or construction waste

3.2. Remove temporary concrete slab, where used

3.3. Flood coffer dam

3.4. Remove sheet pile

3.5. Extract and dismantle sheet piling allowing waterway to restore its original flow

4. Clean up

4.1. Clear work area and dispose of or recycle materials

4.2. Clean, check, maintain and store machinery, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of construction, maintenance and removal of coffer dams including:

selecting and using the required tools and equipment

checking placement of marine cables before coffer dam construction

driving and bracing sheet piles

dewatering, levelling and maintaining dammed area

removing coffer dam

works effectively with others to undertake and complete the construction, maintenance and removal of coffer dams that meets all of the required outcomes including:

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zone

demonstrates completion of constructing, maintaining and removing coffer dams that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying, reporting and recording hazards and risks

construction, maintenance and removal of at least one (1) coffer dam, with at least four (4) sheet piles, large enough to require bracing

The candidate must demonstrate knowledge of the construction, maintenance and removal of coffer dams through:

applying legislative, organisational and site requirements and procedures for:

site and equipment safety requirements

boat and water safety

sheet piling

environmental protection act

dewatering

caulking

dial before you dig

bridge foundations

bridge heritage

calculation of material requirements

identifying equipment types, characteristics, technical capabilities and limitations

applying and monitoring operational, maintenance and basic diagnostic procedures

applying site isolation and traffic control responsibilities and authorities

interpreting and complying with materials safety data sheets and materials handling methods

monitoring quality assurance systems and standards

preparing and/or implementing JSAs/safe work method statements