The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare to control micro tunnelling and pipe-jacking
|
|
Access, interpret and apply documentation and procedures for controlling micro tunnelling and pipe-jacking and ensure compliance to the work activity Completed |
Evidence:
|
Obtain, confirm and apply written and verbal work instructions Completed |
Evidence:
|
Obtain, confirm and apply safety requirements from the site safety plan Completed |
Evidence:
|
Identify, obtain and implement signage requirements from the project traffic management plan Completed |
Evidence:
|
Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults Completed |
Evidence:
|
Identify, confirm and apply environmental protection requirements from the project environmental management plan, Completed |
Evidence:
|
Prepare for boring operations
|
|
Determine location, alignment direction, level and grade of bore from drawings and specifications Completed |
Evidence:
|
Use above and below ground survey instruments to determine the bore pathway for underground vertical and horizontal alignment Completed |
Evidence:
|
Conduct visual geological investigation of alignment to determine the differing soil types and groundwater conditions Completed |
Evidence:
|
Select bore head and drilling fluid for the strata Completed |
Evidence:
|
Position, anchor/stake down boring equipment Completed |
Evidence:
|
Conduct equipment checks
|
|
Identify, confirm and apply safety requirements Completed |
Evidence:
|
Carry out start-up, shutdown and communication procedures Completed |
Evidence:
|
Check equipment controls and functions, including implements or other attachments, anchors and/or stabilising equipment for serviceability and report faults Completed |
Evidence:
|
Conduct inspection and fault finding Completed |
Evidence:
|
Carry out equipment maintenance tasks regularly Completed |
Evidence:
|
Drive bore hole
|
|
Construct launch and receiving pits to accommodate bore rig and tools Completed |
Evidence:
|
Identify and implement trench collapse prevention for launch and receiving pits Completed |
Evidence:
|
Establish thrust wall in accordance with pipe size and soil characteristics Completed |
Evidence:
|
Determine traverse line of pilot hole to receiving pit Completed |
Evidence:
|
Confirm traverse line of pilot hole to receiving pit at specified distances Completed |
Evidence:
|
Collect and dispose spoil Completed |
Evidence:
|
Select and attach augers to drilling machine Completed |
Evidence:
|
Jack through casings/pipes to receiving pit Completed |
Evidence:
|
Monitor equipment for continuity of production in varied site conditions Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of, reuse or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Plan and prepare to control micro tunnelling and pipe-jacking
|
|
Access, interpret and apply documentation and procedures for controlling micro tunnelling and pipe-jacking and ensure compliance to the work activity Completed |
Evidence:
|
Obtain, confirm and apply written and verbal work instructions Completed |
Evidence:
|
Obtain, confirm and apply safety requirements from the site safety plan Completed |
Evidence:
|
Identify, obtain and implement signage requirements from the project traffic management plan Completed |
Evidence:
|
Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults Completed |
Evidence:
|
Identify, confirm and apply environmental protection requirements from the project environmental management plan, Completed |
Evidence:
|
Prepare for boring operations
|
|
Determine location, alignment direction, level and grade of bore from drawings and specifications Completed |
Evidence:
|
Use above and below ground survey instruments to determine the bore pathway for underground vertical and horizontal alignment Completed |
Evidence:
|
Conduct visual geological investigation of alignment to determine the differing soil types and groundwater conditions Completed |
Evidence:
|
Select bore head and drilling fluid for the strata Completed |
Evidence:
|
Position, anchor/stake down boring equipment Completed |
Evidence:
|
Conduct equipment checks
|
|
Identify, confirm and apply safety requirements Completed |
Evidence:
|
Carry out start-up, shutdown and communication procedures Completed |
Evidence:
|
Check equipment controls and functions, including implements or other attachments, anchors and/or stabilising equipment for serviceability and report faults Completed |
Evidence:
|
Conduct inspection and fault finding Completed |
Evidence:
|
Carry out equipment maintenance tasks regularly Completed |
Evidence:
|
Drive bore hole
|
|
Construct launch and receiving pits to accommodate bore rig and tools Completed |
Evidence:
|
Identify and implement trench collapse prevention for launch and receiving pits Completed |
Evidence:
|
Establish thrust wall in accordance with pipe size and soil characteristics Completed |
Evidence:
|
Determine traverse line of pilot hole to receiving pit Completed |
Evidence:
|
Confirm traverse line of pilot hole to receiving pit at specified distances Completed |
Evidence:
|
Collect and dispose spoil Completed |
Evidence:
|
Select and attach augers to drilling machine Completed |
Evidence:
|
Jack through casings/pipes to receiving pit Completed |
Evidence:
|
Monitor equipment for continuity of production in varied site conditions Completed |
Evidence:
|
Clear work area and dispose of, reuse or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|