The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan shaft location to meet design criteria
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Plan location of access shaft on a virgin claim to avoid potential ore-bearing ground Completed |
Evidence:
|
Design and plan shaft to minimise impact on the environment Completed |
Evidence:
|
Plan location of access shaft on a virgin claim to allow effective location, organisation and access to other mine facilities Completed |
Evidence:
|
Establish location of a second means of access (secondary shaft) to allow most effective exit from the mine in emergency situations Completed |
Evidence:
|
If claim is previously mined, inspect conditions of existing shafts to determine the most appropriate access and secondary shafts Completed |
Evidence:
|
Ensure that the access shaft is located in the appropriate place in relation to the planned mine ventilation system Completed |
Evidence:
|
Plan layout and configuration of surface facilities in relation to access and secondary shaft Completed |
Evidence:
|
Record shaft location on the mine plan Completed |
Evidence:
|
Design and plan location of ventilation shafts or drill holes
|
|
Plan the mining sequence throughout the life of the mine to determine the location of ventilation shafts or drill holes Completed |
Evidence:
|
Design and determine the location of ventilation shafts for any proposed secondary ventilation system to deliver fresh air to all active drives Completed |
Evidence:
|
Design and plan mine workings
|
|
Design mine workings to facilitate minerals discovery Completed |
Evidence:
|
Design and plan the drive pattern, opening size and development sequence to best extract minerals and for mine ground stability Completed |
Evidence:
|
Design mine layout to maximise production and movement of materials to the surface Completed |
Evidence:
|
Determine room and pillar configuration and plot on the mine plan Completed |
Evidence:
|
Design and plan materials handling process and equipment
|
|
Design and plan the handling of waste material stored on the surface of the mine Completed |
Evidence:
|
Design and plan for the installation of hoisting systems and equipment to meet materials movement and compliance documentation Completed |
Evidence:
|
plan the system and method for the storage, transport and handling of hazardous materials and/or explosives Completed |
Evidence:
|
Develop the mine safety management plan
|
|
Develop the OHS policy for the mine's operations Completed |
Evidence:
|
Develop and document procedures and methods for the factors covered by the mine safety management plan Completed |
Evidence:
|
Design and develop document control documents and log book Completed |
Evidence:
|
Gain approval for the Mine Safety Management Plan from relevant authorities/agencies Completed |
Evidence:
|