Evidence Guide: RIIMSM303D - Install underground shaft

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIMSM303D - Install underground shaft

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for underground shaft installation

  1. Access, interpret and apply underground shaft installation documentation and ensure the work activity is compliant
  2. Inspect and evaluate site and ground conditions at the planned shaft location and determine the type of shaft to be sunk
  3. Identify and address potential risks and hazards
  4. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply underground shaft installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and evaluate site and ground conditions at the planned shaft location and determine the type of shaft to be sunk

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks and hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate shaft

  1. Conduct or facilitate shaft excavation in planned location
  2. Stabilise unconsolidated ground to prevent falls of ground and shaft collar erosion
  3. Ensure shaft is supported by shaft pillar to ensure the integrity of the bottom section of the shaft
  4. Secure area over shaft collar to prevent surface water inflow
  5. Ensure that brow area near the bottom of the shaft, and the geology and walls, are visible for inspection
Conduct or facilitate shaft excavation in planned location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stabilise unconsolidated ground to prevent falls of ground and shaft collar erosion

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure shaft is supported by shaft pillar to ensure the integrity of the bottom section of the shaft

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Secure area over shaft collar to prevent surface water inflow

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that brow area near the bottom of the shaft, and the geology and walls, are visible for inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit out shaft

  1. Fit access ladders securely in shaft in accordance with shaft conditions and code of practice
  2. Install hoisting equipment at the surface of the shaft
  3. Ensure that services supply devices to the shaft wall are fixed away from shaft conveyance equipment
  4. Install shaft protection to prevent falls by people and animals, and unauthorised entry into the mine
  5. Ensure that access shaft is free of unnecessary equipment and fixtures to allow unrestricted movement of materials
Fit access ladders securely in shaft in accordance with shaft conditions and code of practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install hoisting equipment at the surface of the shaft

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that services supply devices to the shaft wall are fixed away from shaft conveyance equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install shaft protection to prevent falls by people and animals, and unauthorised entry into the mine

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that access shaft is free of unnecessary equipment and fixtures to allow unrestricted movement of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for underground shaft installation

  1. Access, interpret and apply underground shaft installation documentation and ensure the work activity is compliant
  2. Inspect and evaluate site and ground conditions at the planned shaft location and determine the type of shaft to be sunk
  3. Identify and address potential risks and hazards
  4. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply underground shaft installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and evaluate site and ground conditions at the planned shaft location and determine the type of shaft to be sunk

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks and hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate shaft

  1. Conduct or facilitate shaft excavation in planned location
  2. Stabilise unconsolidated ground to prevent falls of ground and shaft collar erosion
  3. Ensure shaft is supported by shaft pillar to ensure the integrity of the bottom section of the shaft
  4. Secure area over shaft collar to prevent surface water inflow
  5. Ensure that brow area near the bottom of the shaft, and the geology and walls, are visible for inspection
Conduct or facilitate shaft excavation in planned location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stabilise unconsolidated ground to prevent falls of ground and shaft collar erosion

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure shaft is supported by shaft pillar to ensure the integrity of the bottom section of the shaft

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Secure area over shaft collar to prevent surface water inflow

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that brow area near the bottom of the shaft, and the geology and walls, are visible for inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit out shaft

  1. Fit access ladders securely in shaft in accordance with shaft conditions and code of practice
  2. Install hoisting equipment at the surface of the shaft
  3. Ensure that services supply devices to the shaft wall are fixed away from shaft conveyance equipment
  4. Install shaft protection to prevent falls by people and animals, and unauthorised entry into the mine
  5. Ensure that access shaft is free of unnecessary equipment and fixtures to allow unrestricted movement of materials
Fit access ladders securely in shaft in accordance with shaft conditions and code of practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install hoisting equipment at the surface of the shaft

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that services supply devices to the shaft wall are fixed away from shaft conveyance equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install shaft protection to prevent falls by people and animals, and unauthorised entry into the mine

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that access shaft is free of unnecessary equipment and fixtures to allow unrestricted movement of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for underground shaft installation

1.1. Access, interpret and apply underground shaft installation documentation and ensure the work activity is compliant

1.2. Inspect and evaluate site and ground conditions at the planned shaft location and determine the type of shaft to be sunk

1.3. Identify and address potential risks and hazards

1.4. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Excavate shaft

2.1. Conduct or facilitate shaft excavation in planned location

2.2. Stabilise unconsolidated ground to prevent falls of ground and shaft collar erosion

2.3. Ensure shaft is supported by shaft pillar to ensure the integrity of the bottom section of the shaft

2.4. Secure area over shaft collar to prevent surface water inflow

2.5. Ensure that brow area near the bottom of the shaft, and the geology and walls, are visible for inspection

3. Fit out shaft

3.1. Fit access ladders securely in shaft in accordance with shaft conditions and code of practice

3.2. Install hoisting equipment at the surface of the shaft

3.3. Ensure that services supply devices to the shaft wall are fixed away from shaft conveyance equipment

3.4. Install shaft protection to prevent falls by people and animals, and unauthorised entry into the mine

3.5. Ensure that access shaft is free of unnecessary equipment and fixtures to allow unrestricted movement of materials

Required Skills and Knowledge

1. Plan and prepare for underground shaft installation

1.1. Access, interpret and apply underground shaft installation documentation and ensure the work activity is compliant

1.2. Inspect and evaluate site and ground conditions at the planned shaft location and determine the type of shaft to be sunk

1.3. Identify and address potential risks and hazards

1.4. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Excavate shaft

2.1. Conduct or facilitate shaft excavation in planned location

2.2. Stabilise unconsolidated ground to prevent falls of ground and shaft collar erosion

2.3. Ensure shaft is supported by shaft pillar to ensure the integrity of the bottom section of the shaft

2.4. Secure area over shaft collar to prevent surface water inflow

2.5. Ensure that brow area near the bottom of the shaft, and the geology and walls, are visible for inspection

3. Fit out shaft

3.1. Fit access ladders securely in shaft in accordance with shaft conditions and code of practice

3.2. Install hoisting equipment at the surface of the shaft

3.3. Ensure that services supply devices to the shaft wall are fixed away from shaft conveyance equipment

3.4. Install shaft protection to prevent falls by people and animals, and unauthorised entry into the mine

3.5. Ensure that access shaft is free of unnecessary equipment and fixtures to allow unrestricted movement of materials

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of installing underground shaft including:

identifying shaft location and types

identifying and installing shaft protection

installing secondary support devices

fitting and locating services in mine shaft

assessing and addressing hazards

identifying faults

maintaining records

identifying and applying environmental constraints

disposing of environmentally sensitive fluids and materials

demonstrates completion of installing underground shafts that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

evaluating site and ground conditions and determining the type of shaft to be sunk

completing shaft excavation

stabilising unconsolidated ground to prevent falls of ground and shaft collar erosion

installing shaft pillar and ensuring the integrity of the bottom section of the shaft

securing area over shaft collar to prevent surface water inflow

The candidate must demonstrate knowledge in installing underground shaft through:

accessing, interpreting and applying legislative, organization and site requirements and procedures for:

emergency procedures

environmental requirements

safety requirements for shaft excavation

shaft excavation and shaft use

conducting assessment of mine ground conditions

identifying shaft location

identifying and evaluating types of shafts

accessing, interpreting and applying shaft excavation methods and equipment

fitting out and locating services in shaft

accessing, interpreting and applying shaft protection methods

accessing, interpreting and applying pillar design and configuration

being prepared for fire/accident/emergency