The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for assisting with mud rotary drilling
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Obtain, confirm and apply work instructions for the allocated task Completed |
Evidence:
|
Identify, manage and report all potential hazards Completed |
Evidence:
|
Resolve coordination requirements with others at the site prior to commencing and during work activities Completed |
Evidence:
|
Load, unload, move, handle, use and store rotary drilling equipment and all associated tools, sampling devices and connecting equipment Completed |
Evidence:
|
Set up and stabilise pipe racks Completed |
Evidence:
|
Wear all necessary personal protective equipment and protective clothing when assisting with rotary mud drilling Completed |
Evidence:
|
Support the rotary mud drilling process
|
|
Fit and remove bits, reamers and stabilizers to and from the drill string Completed |
Evidence:
|
Prepare drill string in readiness for tripping and drilling Completed |
Evidence:
|
Add and remove drill pipe and collars from the drill string Completed |
Evidence:
|
Inspect drill pipe, collars, bits, threads and associated equipment for damage Completed |
Evidence:
|
Observe housekeeping and site safety measures while supporting rotary mud drilling operations Completed |
Evidence:
|
Use pipe and casing handling equipment according to required procedures Completed |
Evidence:
|
Handle samples
|
|
Take necessary safety precautions when handling potentially hazardous samples Completed |
Evidence:
|
Obtain and/or lay out disturbed samples in accordance with workplace, drilling sector or site procedures Completed |
Evidence:
|
Bag, properly label and store samples for transport according to requirements Completed |
Evidence:
|
Clean and service sampling tools Completed |
Evidence:
|
Store undisturbed samples for transport in accordance with standard procedures Completed |
Evidence:
|
Mix drilling fluids
|
|
Wear appropriate protective clothing Completed |
Evidence:
|
Check labels and read and interpret safety information, hazard codes and materials safety data sheets (MSDS) Completed |
Evidence:
|
Apply correct mixing procedure for the drilling fluid Completed |
Evidence:
|
Carry out storage of drilling mud components and additives safely and according recommendations Completed |
Evidence:
|
Perform basic tests on the fluid and record and report the results Completed |
Evidence:
|
Carry out basic maintenance of tools and equipment
|
|
Perform inspections and routine checks on ancillary equipment such as mud pumps, water delivery pumps and mud hoppers Completed |
Evidence:
|
Perform inspections and basic maintenance pipe handling equipment Completed |
Evidence:
|
Observe occupational health and safety procedures in carrying out equipment maintenance Completed |
Evidence:
|