The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIINHB218A - Assist grouting or cementing operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for supporting the grouting or cementing process

  1. Access, interpret and apply compliance documentation relevant to assist grouting or cementing operations
  2. Obtain, confirm and apply work instructions for the grouting or cementing operations
  3. Identify, manage and report all potential hazards
  4. Resolve coordination requirements with others at the site prior to commencing and during the grouting or cementing process
  5. Obtain and use appropriate personal protective equipment for grouting or cementing operations as listed in the work instructions or materials safety data sheets (MSDS)
Access, interpret and apply compliance documentation relevant to assist grouting or cementing operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, confirm and apply work instructions for the grouting or cementing operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, manage and report all potential hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resolve coordination requirements with others at the site prior to commencing and during the grouting or cementing process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and use appropriate personal protective equipment for grouting or cementing operations as listed in the work instructions or materials safety data sheets (MSDS)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate ancillary equipment

  1. Start-up, run, and close down ancillary equipment such as grout pumps and mixers
Start-up, run, and close down ancillary equipment such as grout pumps and mixers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform basic measurement and calculations

  1. Read tape measure accurately to carry out simple measurements of tank capacities, casing or rod lengths as required
  2. Record or complete tally sheets for number of lengths of casing placed in the hole as required
  3. Carry out simple calculations and measurements
  4. Record legibly on all reports
Read tape measure accurately to carry out simple measurements of tank capacities, casing or rod lengths as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record or complete tally sheets for number of lengths of casing placed in the hole as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out simple calculations and measurements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record legibly on all reports

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grout and cement hole

  1. Mix grout and any additives
  2. Follow materials safety data sheets (MSDS) requirements for all materials used
  3. Grout or cement hole using appropriate equipment and techniques
  4. Place grout using appropriate techniques
  5. Construct well head, hole identification and install hole security devices if required
  6. Dispose of any excess grout or cement according to site waste management procedures
Mix grout and any additives

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow materials safety data sheets (MSDS) requirements for all materials used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grout or cement hole using appropriate equipment and techniques

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place grout using appropriate techniques

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct well head, hole identification and install hole security devices if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dispose of any excess grout or cement according to site waste management procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean all equipment at completion of grouting or cementing

  1. Avoid spillage of grout, cement or additives to minimise any associated safety hazards
  2. Use cleaning equipment for cleaning safely and effectively
  3. Apply approved instructions and occupational health and safety requirements on the use of hazardous chemicals for cleaning
  4. Ensure that all cleaning equipment is kept in good working condition
Avoid spillage of grout, cement or additives to minimise any associated safety hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use cleaning equipment for cleaning safely and effectively

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply approved instructions and occupational health and safety requirements on the use of hazardous chemicals for cleaning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that all cleaning equipment is kept in good working condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for assisting with grouting or cementing operations

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of assisting with grouting or cementing operations

working with others to undertake and complete grouting or cementing operations that meet all of the required outcomes

consistent timely completion of assisting with grouting or cementing operations that safely, effectively and efficiently meets the required outcomes

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistently achieving the required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete grouting or cementing operations

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Required Skills and Knowledge

Required skills

Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to assist grouting or cementing operations:

apply legislative, organisation and site requirements and procedures

operate cleaning equipment

apply communication procedures

use mixing equipment

measure tank dimensions and calculate volumes

record casing lengths and quantities accurately

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to assist grouting or cementing operations:

site and equipment safety requirements

possible effects of grout, cement or cement additives on health

environmental requirements and procedures

team roles and objectives during the grouting or cementing operations

properties of grout, cement or cement additives

safe work procedure for the grouting or cementing process

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation

may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Work instructions may come from:

briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:

nature and scope of tasks

specifications

quality of finished works

achievement targets

operational conditions

obtaining of permits required

site layout

out of bounds areas

lighting conditions

plant or equipment defects

hazards and potential hazards

coordination requirements or issues

contamination control requirements

environmental control requirements

barricade and signage requirements

Hazards may include:

spread of contaminants as a result of the grouting or cementing process or cleaning processes

working in proximity to drilling rig

string makeup and breakout hazards

hazardous chemicals

Coordination requirements may include:

driller

other driller's assistants

other equipment operators

supervisors

mine or client personnel

Personal protective equipment includes:

steel-capped boots and hardhat

gloves

dust mask

eye and hearing protection

general protective and reflective clothing

Ancillary equipment may include:

lighting generators

pumps

hand tools

grout mixing

drill fluid (mud) mixing equipment

Calculations and measurements may include:

diameters casing, hole

casing volumes

casing quantities and length

hole volumes

tank volumes

annular volumes

component volumes for grouting

Cleaning equipment may include:

pressure cleaning

chemical cleaning

manual cleaning

abrasive mechanical cleaning