NTISthis.com

Evidence Guide: RIINHB305E - Conduct continuous flight auger drilling

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIINHB305E - Conduct continuous flight auger drilling

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for continuous flight auger drilling

  1. Access, interpret and apply continuous flight auger drilling documentation, and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Communicate and coordinate activities with others throughout the work activity
  6. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply continuous flight auger drilling documentation, and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate and coordinate activities with others throughout the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate continuous flight auger drill

  1. Carry out pre-start and start up procedures
  2. Identify, select and apply rig operational controls
  3. Collar borehole, start hole, maintain hole alignment, take corrective action for deflections
  4. Make up appropriate drill string
  5. Handle additional augers, inserting them in the drill string
  6. Apply rotation, feed and holdback so that flights are substantially full for the soil being drilled at any given depth
  7. Interpret flow from the flights and other factors to determine conditions at the bit
  8. Describe and log, or record, description of the soils being excavated
  9. Make, break auger string and drive head connections
  10. Maintain a clear hole and a clear bottom and deploy tools for cleaning hole bottom at completed depth and/or prior to sampling tool deployment
  11. Interpret and/or calculate actual depth at any point during drilling, interpret depth of strata changes and identify fill depth in any bore
  12. Select appropriate strategies for recovery of dropped augers
  13. Recover drill string using winch and/or head/kelly and disassemble drill string
  14. Select bits for formation being drilled
  15. Select appropriate augering method for situation
  16. Maintain spoil removal from hole collar
  17. Abandon, cover and/or secure bores
  18. Prepare and submit paperwork for daily activities including bore logs where appropriate
  19. Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment
Carry out pre-start and start up procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, select and apply rig operational controls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Collar borehole, start hole, maintain hole alignment, take corrective action for deflections

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make up appropriate drill string

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Handle additional augers, inserting them in the drill string

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply rotation, feed and holdback so that flights are substantially full for the soil being drilled at any given depth

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Interpret flow from the flights and other factors to determine conditions at the bit

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Describe and log, or record, description of the soils being excavated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make, break auger string and drive head connections

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain a clear hole and a clear bottom and deploy tools for cleaning hole bottom at completed depth and/or prior to sampling tool deployment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Interpret and/or calculate actual depth at any point during drilling, interpret depth of strata changes and identify fill depth in any bore

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select appropriate strategies for recovery of dropped augers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recover drill string using winch and/or head/kelly and disassemble drill string

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select bits for formation being drilled

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select appropriate augering method for situation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain spoil removal from hole collar

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Abandon, cover and/or secure bores

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare and submit paperwork for daily activities including bore logs where appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Respond to problems

  1. Identify possible operational problems in equipment or process
  2. Identify symptoms of problems needing remedial action
  3. Determine possible fault causes
  4. Rectify problem using appropriate solution within area of responsibility
  5. Follow through items initiated until final resolution has occurred
  6. Report problems outside area of responsibility to designated person
Identify possible operational problems in equipment or process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify symptoms of problems needing remedial action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine possible fault causes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify problem using appropriate solution within area of responsibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow through items initiated until final resolution has occurred

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report problems outside area of responsibility to designated person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete equipment maintenance and housekeeping

  1. Carry out shutdown and secure equipment
  2. Monitor external wear in drill string, rotate string elements to ensure even wear
  3. Interchange drill bits and/or drill bit elements to maintain free cutting ability
  4. Check all string and equipment elements for wear and proper function
  5. Replace worn elements in string, bits and equipment and recycle ‘out of specification’ equipment for repair or redundancy
  6. Apply lubrication as appropriate
  7. Ensure housekeeping activities are completed
  8. Process records
Carry out shutdown and secure equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor external wear in drill string, rotate string elements to ensure even wear

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Interchange drill bits and/or drill bit elements to maintain free cutting ability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check all string and equipment elements for wear and proper function

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replace worn elements in string, bits and equipment and recycle ‘out of specification’ equipment for repair or redundancy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply lubrication as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure housekeeping activities are completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for continuous flight auger drilling

1.1 Access, interpret and apply continuous flight auger drilling documentation, and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Communicate and coordinate activities with others throughout the work activity

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Operate continuous flight auger drill

2.1 Carry out pre-start and start up procedures

2.2 Identify, select and apply rig operational controls

2.3 Collar borehole, start hole, maintain hole alignment, take corrective action for deflections

2.4 Make up appropriate drill string

2.5 Handle additional augers, inserting them in the drill string

2.6 Apply rotation, feed and holdback so that flights are substantially full for the soil being drilled at any given depth

2.7 Interpret flow from the flights and other factors to determine conditions at the bit

2.8 Describe and log, or record, description of the soils being excavated

2.9 Make, break auger string and drive head connections

2.10 Maintain a clear hole and a clear bottom and deploy tools for cleaning hole bottom at completed depth and/or prior to sampling tool deployment

2.11 Interpret and/or calculate actual depth at any point during drilling, interpret depth of strata changes and identify fill depth in any bore

2.12 Select appropriate strategies for recovery of dropped augers

2.13 Recover drill string using winch and/or head/kelly and disassemble drill string

2.14 Select bits for formation being drilled

2.15 Select appropriate augering method for situation

2.16 Maintain spoil removal from hole collar

2.17 Abandon, cover and/or secure bores

2.18 Prepare and submit paperwork for daily activities including bore logs where appropriate

2.19 Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment

3. Respond to problems

3.1 Identify possible operational problems in equipment or process

3.2 Identify symptoms of problems needing remedial action

3.3 Determine possible fault causes

3.4 Rectify problem using appropriate solution within area of responsibility

3.5 Follow through items initiated until final resolution has occurred

3.6 Report problems outside area of responsibility to designated person

4. Complete equipment maintenance and housekeeping

4.1 Carry out shutdown and secure equipment

4.2 Monitor external wear in drill string, rotate string elements to ensure even wear

4.3 Interchange drill bits and/or drill bit elements to maintain free cutting ability

4.4 Check all string and equipment elements for wear and proper function

4.5 Replace worn elements in string, bits and equipment and recycle ‘out of specification’ equipment for repair or redundancy

4.6 Apply lubrication as appropriate

4.7 Ensure housekeeping activities are completed

4.8 Process records

Required Skills and Knowledge

1. Plan and prepare for continuous flight auger drilling

1.1 Access, interpret and apply continuous flight auger drilling documentation, and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Communicate and coordinate activities with others throughout the work activity

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Operate continuous flight auger drill

2.1 Carry out pre-start and start up procedures

2.2 Identify, select and apply rig operational controls

2.3 Collar borehole, start hole, maintain hole alignment, take corrective action for deflections

2.4 Make up appropriate drill string

2.5 Handle additional augers, inserting them in the drill string

2.6 Apply rotation, feed and holdback so that flights are substantially full for the soil being drilled at any given depth

2.7 Interpret flow from the flights and other factors to determine conditions at the bit

2.8 Describe and log, or record, description of the soils being excavated

2.9 Make, break auger string and drive head connections

2.10 Maintain a clear hole and a clear bottom and deploy tools for cleaning hole bottom at completed depth and/or prior to sampling tool deployment

2.11 Interpret and/or calculate actual depth at any point during drilling, interpret depth of strata changes and identify fill depth in any bore

2.12 Select appropriate strategies for recovery of dropped augers

2.13 Recover drill string using winch and/or head/kelly and disassemble drill string

2.14 Select bits for formation being drilled

2.15 Select appropriate augering method for situation

2.16 Maintain spoil removal from hole collar

2.17 Abandon, cover and/or secure bores

2.18 Prepare and submit paperwork for daily activities including bore logs where appropriate

2.19 Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment

3. Respond to problems

3.1 Identify possible operational problems in equipment or process

3.2 Identify symptoms of problems needing remedial action

3.3 Determine possible fault causes

3.4 Rectify problem using appropriate solution within area of responsibility

3.5 Follow through items initiated until final resolution has occurred

3.6 Report problems outside area of responsibility to designated person

4. Complete equipment maintenance and housekeeping

4.1 Carry out shutdown and secure equipment

4.2 Monitor external wear in drill string, rotate string elements to ensure even wear

4.3 Interchange drill bits and/or drill bit elements to maintain free cutting ability

4.4 Check all string and equipment elements for wear and proper function

4.5 Replace worn elements in string, bits and equipment and recycle ‘out of specification’ equipment for repair or redundancy

4.6 Apply lubrication as appropriate

4.7 Ensure housekeeping activities are completed

4.8 Process records

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of continuous flight auger drilling including:

identifying and reporting all potential hazards, risks and environmental issues

interpreting geological maps, bore logs, diagrams, plans and instructions used for recording and prediction

works effectively with others to undertake and complete the continuous flight auger drilling tasks that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to resolve coordination requirements prior to commencing and during work activities

demonstrates completion of the conduction of continuous flight auger drilling that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

collaring borehole, starting hole, maintaining hole alignment, and taking corrective action for deflections

making up appropriate drill string

handling additional augers, inserting them in the drill string

applying rotation, feed and holdback so that flights are substantially full for the soil being drilled at any given depth

interpreting flow from the flights and other factors to determine conditions at the bit

selecting appropriate strategies for recovery of dropped augers

recovering drill string using winch and/or head/kelly and disassemble drill string

abandoning, covering/securing bores to ensure safety of others and crew

The candidate must demonstrate knowledge in conducting continuous flight auger drilling through:

organisation and site requirements and procedures for:

work, health and safety

environmental issues

operating drill rig

housekeeping

equipment spares and characteristics

equipment technical capabilities, system limitations, gauge readings and their interpretation

operational maintenance procedures for rig and equipment including pre-start checks

basic geological formations likely to be encountered and their properties

preparation for fire/accident/emergency