Evidence Guide: RIIOGD401A - Rig up, conduct pre-spud operations and rig down

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIOGD401A - Rig up, conduct pre-spud operations and rig down

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for operations

  1. Access, interpret and apply compliance documentation relevant to the work activity
  2. Obtain, confirm and apply work instructions for the allocated task
  3. Identify, manage and report all potential hazards
  4. Resolve coordination requirements with others at the site prior to commencing and during work activities
  5. Carry out pre rig-up procedure inspections (by rig manager, operator and crew) in accordance with standards for individual rigs
  6. Coordinate movement of load and sequence of installation and location in accordance with rig movement plan
  7. Check equipment for damage and/or loss by moving contractor and report and BI in accordance with requirements
Access, interpret and apply compliance documentation relevant to the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, confirm and apply work instructions for the allocated task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, manage and report all potential hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resolve coordination requirements with others at the site prior to commencing and during work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre rig-up procedure inspections (by rig manager, operator and crew) in accordance with standards for individual rigs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate movement of load and sequence of installation and location in accordance with rig movement plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment for damage and/or loss by moving contractor and report and BI in accordance with requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rig up to spud

  1. Receive and action rig manager authorisation to commence rig-up to spud operations
  2. Receive detailed instructions on use and type of mud from the operator and distribute as appropriate and to required specifications
  3. Identify potential rig-up problems and take corrective action
  4. Keep rig manager informed of operations in accordance with legislative and company requirements
Receive and action rig manager authorisation to commence rig-up to spud operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive detailed instructions on use and type of mud from the operator and distribute as appropriate and to required specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify potential rig-up problems and take corrective action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Keep rig manager informed of operations in accordance with legislative and company requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for drilling of surface hole/subsea hole

  1. Check drilling and hoist equipment, report damage to rig manager and record in accordance with company policies and procedures
  2. Conduct equipment checks for nippling-up or cross-checked with relevant procedures
  3. Check handling equipment for correct sizing and if fit for purpose
  4. Confirm availability of and inspect, clean, calibrate and record tubulars in accordance with requirements
  5. Check well control equipment against work program requirements
  6. Identify special tool requirements and check if fit for purpose and approved for use
Check drilling and hoist equipment, report damage to rig manager and record in accordance with company policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment checks for nippling-up or cross-checked with relevant procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check handling equipment for correct sizing and if fit for purpose

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability of and inspect, clean, calibrate and record tubulars in accordance with requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check well control equipment against work program requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify special tool requirements and check if fit for purpose and approved for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for pre-spud operations

  1. Lock pipe racks with drill pipe and position drill collars for immediate use
  2. Inspect casing running tools and prepare for operation
  3. Record casing tallies and report to appropriate company officer
Lock pipe racks with drill pipe and position drill collars for immediate use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect casing running tools and prepare for operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record casing tallies and report to appropriate company officer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct operations as per drilling program

  1. Determine optimum circulating and penetration rates and check deviations are in accordance with operators drilling program
  2. Continually check mud cleaning equipment and screens for integrity and correct operation
  3. Check drilling fluid quantities against program requirements with sufficient being in reserve to kill well and keep hole on full trip
  4. Record correct mud properties on tour report
  5. Operate all equipment in accordance with manufacturer regulations and company procedures
  6. Maintain a sound working relationship with third party contractors
Determine optimum circulating and penetration rates and check deviations are in accordance with operators drilling program

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continually check mud cleaning equipment and screens for integrity and correct operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check drilling fluid quantities against program requirements with sufficient being in reserve to kill well and keep hole on full trip

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record correct mud properties on tour report

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate all equipment in accordance with manufacturer regulations and company procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain a sound working relationship with third party contractors

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rig down

  1. Receive and action rig manager authorisation to commence rig-down operations
  2. Identify potential rig-down problems and take corrective action
  3. Keep rig manager informed of operations in accordance with legislative and company requirements
Receive and action rig manager authorisation to commence rig-down operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify potential rig-down problems and take corrective action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Keep rig manager informed of operations in accordance with legislative and company requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for rig up, pre-spud and rig down operations

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of rig up, pre-spud and rig down operations

working with others to plan, prepare and conduct rig up, pre-spud and rig down operations

evidence of the consistent successful rig up, pre-spud and rig down operations

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete rig up, pre-spud and rig down operations

provision of clear and timely instruction and supervision by the individual of those involved in the conduct of rig up, pre-spud and rig down operations

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Required Skills and Knowledge

Required skills

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to rig up, conduct pre-spud operations and rig down:

apply legislative, organisation and site requirements and procedures

oversee rigging

manage and maintain pre-spud operations

participate in inspections

develop crew schedules and allocate jobs

oversee mud-mixing operations

check equipment/tools and record, report and rectify faults

delegate

problem solve

plan for all circumstances

operate forklift in line with licensing requirements

read, interpret and apply regulations/company procedures

convert from metric to imperial measurement

carrying out calculations including:

quantities

up-hole velocity

specific gravity

volume

hydrostatic pressures

operate machinery in a safe manner

communicate effectively with management, crew and contractors

meeting skills

negotiation skills

troubleshoot during drilling program

read documents including:

load schedules

operating procedures

forms

government specifications

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to rig up, conduct pre-spud operations and rig down:

rigging and slinging

forklift operations

local authorities

rig specifications and measurements

metric-imperial conversion

marine operations

drilling program to pre-spud operations

drilling equipment

rig up procedures

casing

mud systems

routine drilling operations

Job Safety Analysis (JSA)

marine operations

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures including:

Petroleum Submerged Lands Act (PSLA)

confined space

occupational health and safety

duty of care

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

job sheet analysis (JSA)

organisational documentation may include:

hazard sheets

lease layout

rig layout

rig standards/specifications

instructions (e.g. use and type of mud)

drilling plan

chemical labels

operator manuals

load schedules

operating procedures

Work instructions may come from briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:

crewing schedules and allocating jobs to crew with drilling plan and prognosis being discussed with crews

safety briefing/induction

pre-tour safety meeting

tour changeover discussions

operator's representative memorandums

weekly safety meetings

Job Safety Analysis (JSA)

instructions for specific jobs including:

unloading of trucks

unsecuring of loads

assembling of rig

connecting power

trench digging

checking installation of safety equipment

installing waste pits

stowing equipment in correct stowages

drilling parameters to be maintained

mud density

casing depths

pre-safety check

pre-spud check

individual operation

team operation

use of personal protective equipment

consideration of h2s and other toxic substances

continuous communication maintained

reacting to on-site emergencies

emergency disconnect sequence

agreed procedures may include but are not limited to:

company

facility

client

maintaining records including:

crewing schedules

rig up checklist

pre-spud audit

tubular tallies

nature and scope of tasks

specifications

quality of finished works

achieved targets

operational conditions

obtaining of required permits

site layout

out of bounds areas

worksite inspection requirements

lighting conditions

plant of equipment defects

coordination requirements or issues

contamination control requirements

environmental control requirements

barricade and signage requirements

remedial action to be taken to deal with errors, omissions and shortages include:

corrective action request against procedures

altering Job Safety Analysis (JSA) to include improved procedures

Hazards may include:

working in proximity to drilling rig

working in different conditions including:

night time operations

day time operations

hot climates

cold climates

wet weather conditions

high wind

Coordination requirements may include:

developing crewing schedules and allocating jobs to crews in line with operational requirements

other equipment operators

maintenance personnel

supervisors

site personnel

Equipment may include:

drill strings

handling gear including tools

drilling rig and components

instrumentation

tubulars

mud system and auxiliary equipment

Instructions may be received via:

2-way radio

hand signals

telephone

public address system

written work instructions

internet or intranet communications

Corrective action may include:

informing rig manager

informing company representative

allocating maintenance tasks to appropriate person

Record may include:

damage reports

casing tallies

pre-spud operational reports