The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for road construction and maintenance
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Plan and prepare work Completed |
Evidence:
|
Receive, interpret and clarify shift change over details Completed |
Evidence:
|
Select personal protective equipment appropriate for work activities Completed |
Evidence:
|
Select appropriate type of equipment and materials according to job type and specifications to maximise efficiency and effectiveness of work activities Completed |
Evidence:
|
Perform equipment pre-start checks Completed |
Evidence:
|
Identify, address and report potential risks and hazards Completed |
Evidence:
|
Identify, address and report environmental issues Completed |
Evidence:
|
Adhere to emergency procedures as per site procedures Completed |
Evidence:
|
Inspect and assess site conditions to determine if scaling is required and take action Completed |
Evidence:
|
Use approved dust suppression and extraction methods Completed |
Evidence:
|
Erect signs or barricades and/or safety provisions Completed |
Evidence:
|
Ensure area is well ventilated before entry into work area Completed |
Evidence:
|
Construct roads
|
|
Prepare road surface and apply road material to meet planned road characteristics and engineering specifications Completed |
Evidence:
|
Construct road to conform with road design and location as specified by work plan Completed |
Evidence:
|
Check for and remove contaminants Completed |
Evidence:
|
Construct drains and water crossing points as appropriate for the removal of run-off and avoid accumulation of excessive water to minimise road damage Completed |
Evidence:
|
Ensure access ways are clear whilst constructing road Completed |
Evidence:
|
Organise for excess road material to be removed Completed |
Evidence:
|
Suppress dust utilising approved method Completed |
Evidence:
|
Complete all required documentation clearly, concisely and on time Completed |
Evidence:
|
Pass on end of shift information to oncoming shift Completed |
Evidence:
|
Maintain roads
|
|
Maintain condition of roads to meet volume of traffic Completed |
Evidence:
|
Maintain effective drainage for the removal of excess water and ensure safe hauling surface Completed |
Evidence:
|
Conduct housekeeping activities
|
|
Check road ensuring site is serviceable Completed |
Evidence:
|
Carry out shutdown procedures Completed |
Evidence:
|
Service and make minor adjustments to equipment Completed |
Evidence:
|