Evidence Guide: RIIUND310D - Apply shot-crete underground

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIUND310D - Apply shot-crete underground

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to apply shot-crete underground

  1. Access, interpret and apply shot-crete documentation and ensure the work activity is compliant
  2. Obtain, interpret clarify and confirm work requirements and shift changeover details before proceeding
  3. Select and wear appropriate personal protective equipment for work activity
  4. Select appropriate equipment, safety equipment and ground control materials
  5. Inspect and assess site conditions to determine if scaling is required and take action
  6. Conduct equipment pre-start checks
  7. Identify, address and report potential risks, hazards and environmental issues
  8. Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
  9. Inspect and assess appropriateness of ground control mechanism
  10. Use approved dust suppression equipment and/or extraction methods to ensure adequate ventilation
Access, interpret and apply shot-crete documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret clarify and confirm work requirements and shift changeover details before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear appropriate personal protective equipment for work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select appropriate equipment, safety equipment and ground control materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions to determine if scaling is required and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start checks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential risks, hazards and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess appropriateness of ground control mechanism

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression equipment and/or extraction methods to ensure adequate ventilation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply shot-crete

  1. Prepare and clean targeted surface to ensure maximum cohesion of shot-crete
  2. Erect barriers
  3. Minimise the creation of gases and personnel exposure to fumes according to safe shot-creting processes
  4. Select and apply shot-crete utilising appropriate application method according to manufacturer’s guidelines and ground condition
Prepare and clean targeted surface to ensure maximum cohesion of shot-crete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect barriers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Minimise the creation of gases and personnel exposure to fumes according to safe shot-creting processes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and apply shot-crete utilising appropriate application method according to manufacturer’s guidelines and ground condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct housekeeping activities

  1. Maintain barriers/signs after shot-creting
  2. Complete all required documentation clearly, concisely and on time
  3. Clean equipment, ascertain condition of equipment and ensure safe and efficient operations
  4. Pass on end of shift information to oncoming shift
Maintain barriers/signs after shot-creting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete all required documentation clearly, concisely and on time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean equipment, ascertain condition of equipment and ensure safe and efficient operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pass on end of shift information to oncoming shift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to apply shot-crete underground

  1. Access, interpret and apply shot-crete documentation and ensure the work activity is compliant
  2. Obtain, interpret clarify and confirm work requirements and shift changeover details before proceeding
  3. Select and wear appropriate personal protective equipment for work activity
  4. Select appropriate equipment, safety equipment and ground control materials
  5. Inspect and assess site conditions to determine if scaling is required and take action
  6. Conduct equipment pre-start checks
  7. Identify, address and report potential risks, hazards and environmental issues
  8. Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
  9. Inspect and assess appropriateness of ground control mechanism
  10. Use approved dust suppression equipment and/or extraction methods to ensure adequate ventilation
Access, interpret and apply shot-crete documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret clarify and confirm work requirements and shift changeover details before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear appropriate personal protective equipment for work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select appropriate equipment, safety equipment and ground control materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions to determine if scaling is required and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start checks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential risks, hazards and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess appropriateness of ground control mechanism

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression equipment and/or extraction methods to ensure adequate ventilation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply shot-crete

  1. Prepare and clean targeted surface to ensure maximum cohesion of shot-crete
  2. Erect barriers
  3. Minimise the creation of gases and personnel exposure to fumes according to safe shot-creting processes
  4. Select and apply shot-crete utilising appropriate application method according to manufacturer’s guidelines and ground condition
Prepare and clean targeted surface to ensure maximum cohesion of shot-crete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect barriers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Minimise the creation of gases and personnel exposure to fumes according to safe shot-creting processes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and apply shot-crete utilising appropriate application method according to manufacturer’s guidelines and ground condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct housekeeping activities

  1. Maintain barriers/signs after shot-creting
  2. Complete all required documentation clearly, concisely and on time
  3. Clean equipment, ascertain condition of equipment and ensure safe and efficient operations
  4. Pass on end of shift information to oncoming shift
Maintain barriers/signs after shot-creting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete all required documentation clearly, concisely and on time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean equipment, ascertain condition of equipment and ensure safe and efficient operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pass on end of shift information to oncoming shift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to apply shot-crete underground

1.1 Access, interpret and apply shot-crete documentation and ensure the work activity is compliant

1.2 Obtain, interpret clarify and confirm work requirements and shift changeover details before proceeding

1.3 Select and wear appropriate personal protective equipment for work activity

1.4 Select appropriate equipment, safety equipment and ground control materials

1.5 Inspect and assess site conditions to determine if scaling is required and take action

1.6 Conduct equipment pre-start checks

1.7 Identify, address and report potential risks, hazards and environmental issues

1.8 Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

1.9 Inspect and assess appropriateness of ground control mechanism

1.10 Use approved dust suppression equipment and/or extraction methods to ensure adequate ventilation

2. Apply shot-crete

2.1 Prepare and clean targeted surface to ensure maximum cohesion of shot-crete

2.2 Erect barriers

2.3 Minimise the creation of gases and personnel exposure to fumes according to safe shot-creting processes

2.4 Select and apply shot-crete utilising appropriate application method according to manufacturer’s guidelines and ground condition

3. Conduct housekeeping activities

3.1 Maintain barriers/signs after shot-creting

3.2 Complete all required documentation clearly, concisely and on time

3.3 Clean equipment, ascertain condition of equipment and ensure safe and efficient operations

3.4 Pass on end of shift information to oncoming shift

Required Skills and Knowledge

1. Plan and prepare to apply shot-crete underground

1.1 Access, interpret and apply shot-crete documentation and ensure the work activity is compliant

1.2 Obtain, interpret clarify and confirm work requirements and shift changeover details before proceeding

1.3 Select and wear appropriate personal protective equipment for work activity

1.4 Select appropriate equipment, safety equipment and ground control materials

1.5 Inspect and assess site conditions to determine if scaling is required and take action

1.6 Conduct equipment pre-start checks

1.7 Identify, address and report potential risks, hazards and environmental issues

1.8 Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

1.9 Inspect and assess appropriateness of ground control mechanism

1.10 Use approved dust suppression equipment and/or extraction methods to ensure adequate ventilation

2. Apply shot-crete

2.1 Prepare and clean targeted surface to ensure maximum cohesion of shot-crete

2.2 Erect barriers

2.3 Minimise the creation of gases and personnel exposure to fumes according to safe shot-creting processes

2.4 Select and apply shot-crete utilising appropriate application method according to manufacturer’s guidelines and ground condition

3. Conduct housekeeping activities

3.1 Maintain barriers/signs after shot-creting

3.2 Complete all required documentation clearly, concisely and on time

3.3 Clean equipment, ascertain condition of equipment and ensure safe and efficient operations

3.4 Pass on end of shift information to oncoming shift

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

demonstrates completion of the application of shot-crete underground that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

applying hydroscaling techniques to clean and remove skate prior to shot-creting

completing equipment pre-start checks

inspecting and assessing ground control mechanism

preparing and cleaning the targeted surface

erecting barriers

selecting and applying shot-crete

The candidate must demonstrate knowledge in applying shot-crete underground through:

dewatering procedures and characteristics

environmental procedures

equipment safety requirements

ground control characteristics and applications

explosive identification

shot-creting techniques