Evidence Guide: RIIWSV401E - Rig up and rig down for well servicing operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIWSV401E - Rig up and rig down for well servicing operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for operations

  1. Obtain, interpret and confirm and apply work instructions
  2. Access, interpret and apply compliance documentation and legislation and confirm work activity is compliant
  3. Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures
  4. Carry out gas testing according to site requirements
  5. Confirm well bore stability
  6. Confirm personnel coordination requirements at the site are met prior to commencement of work activities
  7. Carry out pre rig-up procedure inspections within scope of own role and according to standards for individual rigs
  8. Coordinate movement of load and sequence of installation and location according to rig movement plan
  9. Check equipment for damage and loss by moving contractor and report and BI according to requirements
  10. Receive, acknowledge and action rig manager authorisation to commence rig-up operations
  11. Receive detailed instructions on use and type of mud, fluid or air from the operator and distribute as required and to required specifications
  12. Identify potential rig-up problems and take corrective action as required and within scope of own role
  13. Keep rig manager informed of operations according to legislative and company requirements
Obtain, interpret and confirm and apply work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Access, interpret and apply compliance documentation and legislation and confirm work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out gas testing according to site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm well bore stability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm personnel coordination requirements at the site are met prior to commencement of work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre rig-up procedure inspections within scope of own role and according to standards for individual rigs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate movement of load and sequence of installation and location according to rig movement plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment for damage and loss by moving contractor and report and BI according to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive, acknowledge and action rig manager authorisation to commence rig-up operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive detailed instructions on use and type of mud, fluid or air from the operator and distribute as required and to required specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify potential rig-up problems and take corrective action as required and within scope of own role

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Keep rig manager informed of operations according to legislative and company requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for well servicing operations

  1. Check rig and hoist equipment, report damage to rig manager and record according to company policies and procedures as required
  2. Conduct equipment checks for nippling-up or cross-checked with required procedures
  3. Confirm and check handling equipment for required sizing and if fit for purpose
  4. Confirm availability of and inspect, clean, calibrate and record tubulars according to requirements
  5. Check well control equipment against work program requirements
  6. Identify special tool requirements and check if fit for purpose and approved for use
Check rig and hoist equipment, report damage to rig manager and record according to company policies and procedures as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment checks for nippling-up or cross-checked with required procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and check handling equipment for required sizing and if fit for purpose

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability of and inspect, clean, calibrate and record tubulars according to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check well control equipment against work program requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify special tool requirements and check if fit for purpose and approved for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare start operations

  1. Load rod racks with rod/down hole production equipment tubulars and position drill collars for immediate use
  2. Inspect /tubulars down hole running tools and prepare for operation
  3. Record in writing casing/tubular/down hole tallies and report to appropriate company officer
Load rod racks with rod/down hole production equipment tubulars and position drill collars for immediate use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect /tubulars down hole running tools and prepare for operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record in writing casing/tubular/down hole tallies and report to appropriate company officer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct operations according to instructions

  1. Determine optimum circulating rates and operational penetration rates and check deviations are in accordance with operators’ program
  2. Check circulating equipment for immediate operation
  3. Check fluid quantity requirements with sufficient being in reserve to kill well and keep hole on full trip
  4. Record in writing fluid properties in tally book
  5. Operate all equipment according to manufacturer regulations and company procedures
  6. Maintain a sound working relationship with third party contractors
  7. Receive and action rig manager authorisation to commence rig-down operations
  8. Identify potential rig-down problems and take corrective action as required and within scope of own role
  9. Keep rig manager informed of operations
Determine optimum circulating rates and operational penetration rates and check deviations are in accordance with operators’ program

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check circulating equipment for immediate operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check fluid quantity requirements with sufficient being in reserve to kill well and keep hole on full trip

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record in writing fluid properties in tally book

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate all equipment according to manufacturer regulations and company procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain a sound working relationship with third party contractors

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive and action rig manager authorisation to commence rig-down operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify potential rig-down problems and take corrective action as required and within scope of own role

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Keep rig manager informed of operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

The candidate must demonstrate the ability to complete the tasks outlined in the elements, performance criteria and foundation skills of this unit, including evidence of the ability to:

rig up and rig down for well servicing operations on at least two occasions, including:

carrying out gas testing, rig-up and rig-down procedures

monitoring and confirming well bore stability

coordinating load movements

conducting inspections on equipment, reporting faults and implementing corrective actions

loading, inspecting and recording rod racks with tubulars

identifying circulating and penetration rates

operating required plant and equipment

processing written records and reports.

During the above, the candidate must:

locate and apply legislation, documentation, policies and procedures required to rig up and rig down for well servicing operations

work with others to undertake and complete the rig up and rig down for well servicing operations that meets required outcomes, including:

complying with written and verbal reporting requirements and procedures

communicating with others to receive and clarify work instructions

communicating with others to determine coordination requirements throughout work activities.

The candidate must be able to demonstrate knowledge to complete the tasks outlined in the elements, performance criteria and foundation skills of this unit, including knowledge of:

key legislation required to rig up and rig down for well servicing operations

key policies, procedures and established requirements to rig up and rig down for well servicing operations, including those for:

gas testing

applying unit rigging and slinging

identifying rig specifications and measurements

performing metric-imperial conversion

determining the program to pre-start operations

identifying and resourcing equipment

carrying out and managing rig up procedures

maintaining fluid systems

performing routine well servicing operations

environmental issues.