The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Inspect and service line and cable routes
|
|
Routes are inspected and recorded and arrangements are made for the removal of any obstructions, damage, infringing vegetation to provide free access to cables/aerials Completed |
Evidence:
|
Routes are physically inspected to determine any breaks, misalignments, damage and insulation wear requiring repair Completed |
Evidence:
|
Poles are inspected for deterioration and a safety assessment is made Completed |
Evidence:
|
Diagnose line and cable faults
|
|
Permission to test isolated equipment is confirmed prior to any work being undertaken Completed |
Evidence:
|
Probable location of fault is identified from visual inspection and circuit tests are conducted to isolate fault area Completed |
Evidence:
|
The nature of the fault is identified from further tests and corrective action required is identified to enable appropriate arrangements for resources and for work to be performed Completed |
Evidence:
|
Disconnection/insulation procedures are applied to enable maintenance work to be carried out in isolation to systems where lines are in close proximity to high voltage services Completed |
Evidence:
|
Repair line and cable faults
|
|
Work site is made safe in accordance with organisations safety requirements to enable repair work to be safely undertaken Completed |
Evidence:
|
Aerial lines/cables are repaired to operational and technical requirements using appropriate jointing or replacement/repair procedures Completed |
Evidence:
|
Repaired/replaced line/cable is tested to specified standards to ensure conformity to operational and technical requirements Completed |
Evidence:
|
Appropriate personnel are notified of completed repairs/replacement and appropriate documentation is completed in accordance with organisations requirements and returned to appropriate organisation/department as required Completed |
Evidence:
|