The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Set up motive power unit for radio remote operation
|
|
Motive power unit is prepared for operation according to organisational procedures Completed |
Evidence:
|
Ensure motive power unit is set up for manual operation and all other cabin operations are set in the normal or manual manner Completed |
Evidence:
|
Motive power unit is started as per standard procedure Completed |
Evidence:
|
If necessary, the radio remote control equipment is installed according to operational requirements and manufactures instructions Completed |
Evidence:
|
Check that the remote control box and motive power unit controls are set up according to operational requirements Completed |
Evidence:
|
Relevant OH&S requirements are followed to prevent injury and damage Completed |
Evidence:
|
Operate motive power unit using radio remote control equipment
|
|
Motive power unit and radio remote control system set-up is checked to ensure safe operational status Completed |
Evidence:
|
Radio remote control equipment is operated and monitored in accordance with operational requirements during train movements to provide safe train handling and control Completed |
Evidence:
|
Any operational difficulties encountered are addressed by re-establishing control of the motive power unit with minimum risk to personnel and equipment Completed |
Evidence:
|
Shut down radio remote control equipment
|
|
Motive power unit is secured against accidental movement Completed |
Evidence:
|
Shut-down procedures of radio remote control equipment are followed to ensure train security and correct deactivation of the system Completed |
Evidence:
|
If required, radio remote control equipment is removed from the locomotive Completed |
Evidence:
|