NTISthis.com

Evidence Guide: TLILIC0006 - Licence to operate a bridge and gantry crane

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLILIC0006 - Licence to operate a bridge and gantry crane

What evidence can you provide to prove your understanding of each of the following citeria?

Plan work/task

  1. Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and site inspection in accordance with workplace procedures
  2. Working area is inspected and appropriate paths for operating the bridge or gantry crane and moving/placing load/s in work area are assessed and determined in accordance with workplace procedures
  3. Work area operating surface is assessed to determine the quality of ground suitability for operational gantry crane in accordance workplace procedures
  4. Bridge or gantry crane Rated Capacity (RC) and lifting gear Working Load Limit (WLL) are established for the load/s and work/task requirements in accordance with manufacturer specifications and workplace procedures
  5. Relevant hazard identification and risk elimination/control measures are applied and advised to relevant person/s in accordance with workplace procedures
  6. Traffic management plan implementation is confirmed and followed in accordance with workplace procedures
  7. Appropriate communication procedures are identified, tested with associated personnel in accordance workplace procedures
  8. All tasks are confirmed to ensure requirements for the relevant work area in accordance with workplace procedures
Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and site inspection in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Working area is inspected and appropriate paths for operating the bridge or gantry crane and moving/placing load/s in work area are assessed and determined in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area operating surface is assessed to determine the quality of ground suitability for operational gantry crane in accordance workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane Rated Capacity (RC) and lifting gear Working Load Limit (WLL) are established for the load/s and work/task requirements in accordance with manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant hazard identification and risk elimination/control measures are applied and advised to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Traffic management plan implementation is confirmed and followed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate communication procedures are identified, tested with associated personnel in accordance workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All tasks are confirmed to ensure requirements for the relevant work area in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for work/task

  1. Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures
  2. Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
  3. Bridge or gantry crane is accessed safely in accordance with manufacturer specifications and safe work procedures
  4. Pre-start bridge or gantry crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with safe work procedures and manufacturer specifications
  5. Bridge or gantry crane is set up and rigged correctly with any lifting gear as per lift plan in accordance with relevant manufacturer specifications including load chart/s and safe work procedures
  6. Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer specifications and safe work procedures
  7. All controls are located, identified and tested in accordance with relevant manufacturer specifications and safe work procedures
  8. Crane logbook is inspected and is correct for the crane and type and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
  9. Weather and work environment conditions are assessed to determine any impact on bridge or gantry crane operations in accordance with manufacturer requirements and safe work procedures
Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane is accessed safely in accordance with manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-start bridge or gantry crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with safe work procedures and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane is set up and rigged correctly with any lifting gear as per lift plan in accordance with relevant manufacturer specifications including load chart/s and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All controls are located, identified and tested in accordance with relevant manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Crane logbook is inspected and is correct for the crane and type and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Weather and work environment conditions are assessed to determine any impact on bridge or gantry crane operations in accordance with manufacturer requirements and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform work/task

  1. Lifts are determined within the RC of the bridge or gantry crane in accordance with load chart/s and lift plan
  2. Hook block is safely positioned over the load in accordance with safe work procedures and if crane is controlled from cabin following directions from associated personnel
  3. Lifting gear is connected to load and used safely in accordance with the lift plan and safe work procedures
  4. Test lift is carried out in accordance with dogging and safe work procedures
  5. Loads are transferred using relevant bridge or gantry crane movements and tag lines as required, in accordance with lift plan and safe work procedures
  6. Load and bridge or gantry crane movement is monitored constantly and operated safely in accordance with lift plan and safe work procedures
  7. All required communications signals are correctly interpreted and followed whilst crane is operated in accordance with safe work procedures
  8. Load is lowered and landed safely in accordance with lift plan and safe work procedures
  9. Lifting gear is disconnected from load and positioned safely and efficiently for next task in accordance with lift plan and safe work procedures
  10. Bridge or gantry crane is parked in accordance with manufacturer specifications and safe work procedures
  11. Bridge or gantry crane lifting gear and associated equipment is stowed and secured in accordance with safe work procedures
  12. Relevant motion locks and brakes are applied as required in accordance with manufacturer specifications and safe work procedures
  13. Bridge or gantry crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
  14. Post operational bridge or gantry crane checks are carried out in accordance with safe work procedures and manufacturer specifications
  15. Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and site inspection in accordance with workplace procedures
Lifts are determined within the RC of the bridge or gantry crane in accordance with load chart/s and lift plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hook block is safely positioned over the load in accordance with safe work procedures and if crane is controlled from cabin following directions from associated personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting gear is connected to load and used safely in accordance with the lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test lift is carried out in accordance with dogging and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Loads are transferred using relevant bridge or gantry crane movements and tag lines as required, in accordance with lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load and bridge or gantry crane movement is monitored constantly and operated safely in accordance with lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All required communications signals are correctly interpreted and followed whilst crane is operated in accordance with safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load is lowered and landed safely in accordance with lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting gear is disconnected from load and positioned safely and efficiently for next task in accordance with lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane is parked in accordance with manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane lifting gear and associated equipment is stowed and secured in accordance with safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant motion locks and brakes are applied as required in accordance with manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Post operational bridge or gantry crane checks are carried out in accordance with safe work procedures and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and site inspection in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Working area is inspected and appropriate paths for operating the bridge or gantry crane and moving/placing load/s in work area are assessed and determined in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area operating surface is assessed to determine the quality of ground suitability for operational gantry crane in accordance workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane Rated Capacity (RC) and lifting gear Working Load Limit (WLL) are established for the load/s and work/task requirements in accordance with manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant hazard identification and risk elimination/control measures are applied and advised to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Traffic management plan implementation is confirmed and followed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate communication procedures are identified, tested with associated personnel in accordance workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All tasks are confirmed to ensure requirements for the relevant work area in accordance with workplace procedures

  1. Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures
Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane is accessed safely in accordance with manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-start bridge or gantry crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with safe work procedures and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane is set up and rigged correctly with any lifting gear as per lift plan in accordance with relevant manufacturer specifications including load chart/s and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All controls are located, identified and tested in accordance with relevant manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Crane logbook is inspected and is correct for the crane and type and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Weather and work environment conditions are assessed to determine any impact on bridge or gantry crane operations in accordance with manufacturer requirements and safe work procedures

  1. Lifts are determined within the RC of the bridge or gantry crane in accordance with load chart/s and lift plan
Lifts are determined within the RC of the bridge or gantry crane in accordance with load chart/s and lift plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hook block is safely positioned over the load in accordance with safe work procedures and if crane is controlled from cabin following directions from associated personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting gear is connected to load and used safely in accordance with the lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test lift is carried out in accordance with dogging and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Loads are transferred using relevant bridge or gantry crane movements and tag lines as required, in accordance with lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load and bridge or gantry crane movement is monitored constantly and operated safely in accordance with lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All required communications signals are correctly interpreted and followed whilst crane is operated in accordance with safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load is lowered and landed safely in accordance with lift plan and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting gear is disconnected from load and positioned safely and efficiently for next task in accordance with lift plan and safe work procedures

  1. Bridge or gantry crane is parked in accordance with manufacturer specifications and safe work procedures
Bridge or gantry crane is parked in accordance with manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane lifting gear and associated equipment is stowed and secured in accordance with safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant motion locks and brakes are applied as required in accordance with manufacturer specifications and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bridge or gantry crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Post operational bridge or gantry crane checks are carried out in accordance with safe work procedures and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non -essential conditions may be found in the Companion Volume Implementation Guide.